Shingle Type Chestnut Coffee Spots Relitop Natural Stone Coated Metal Roof Tile 0.35MM 0.4MM 0.5MM Aluminum Zinc Steel Plate
Negotiable
Min.Order:1
Stone coated metal roof tiles,a type of new high-tech building material product.
Based on Al-Zn alloy steel sheet and coated by eco-friendly acrylic resin glue with the natural stone chips.
It's becoming a global popularity roofing material because of these superiority:
Advantages:
1.Resistance
2.Light weight
3.Construction convenience
4.Economical
5.50 years guarantee
Product item | Stone Coated Metal Roof Tile |
Roofing tile materials | Galvanized sheet steel |
Roofing tile size | 1340mm*420mm*0.4mm |
Weight | 2.6kg/pcs |
Optional thickness | 0.3/0.35/0.40/0.45/0.50mm |
Color | 10 colors |
Life guarantee | 50 years quailty guarantee |
Application | roofing tile of Villas ,townhouse, apartments ,tourist destination building ,and roof conversion project |
Authentication | SGS,Soncap,Gold& Verified supplier of alibaba |
Provide | Free sample, Real-time tracking status |
MOQ | 100 pieces |
Our Service:
1, Best quality with competitive price
2, Guarantee :50 YEARS
3, Free sample, Free Fitting Kit (Glue and Sand)
4, Provide Tracking picture of transportion, production,loading monment
5, Quality Guarantee After receiving the goods
6, Dierct manufactory supply with stable quantity & reliable quality
7, SGS,Soncap Assessment
8, Gold& Verified supplier of alibaba
Classic Type Milano Type Nosen Type Shingle Type
Any question? Please Contact me !
The product based on Al-Zn (known as Zincalume or Galalume steel) steel and coated with high quality stone, is the stylish construction material for roof.
Each series is available for 10 colors which makes those tiles fit for different decoration stylish.
Relitop Metal Products Factory is located in the Pearl River Delta land and water transportation famous hardware town-Gaoyao City Jinli Town. It is a modern metal industry and trade enterprises including product development, design, production and sales.
Since its inception, the factory with a wealth of production experience, advanced production equipment, macro thick technical force and strict professional management and innovative development, production, excellent quality, fashionable and varied stone coated metal roofing.
Our factory has always been adhering to the ”quality, integrity, innovation” business philosophy, and strive to forge ahead and improve the international competitiveness of its own brand, product market share and service leves; the same time, in good faith to seek domestic and international distribution partners, hoping to friendship and cooperation, win-win development for a better tomorrow.
FAQ
Q : Will a Steel roof make my home hot in summer?
A :No. A properly vented steel roof system moves air both between the shingles and the underlying deck as well as moving air from vents under the decking. Heated air is allowed to dissipate through the ridgeline as cooler air is drawn through eave vents. Reduced energy bills can result from airflow both under andover the decking.
Q : Can you walk on a steel roof?
A :Yes. Some care must be exercised while walking on the roof, but note that roofers walk all over the shingles during the installation process.
Q : Is stone coated metal roofing tile noisy?
A :No! The dead air space between Stone coated metal roofing Panel sand the roof decking combined with the stone coating dampens exterior noise even in a rainstorm.
Q : Is stone coated metal roofing system Heavy?
A :Stone coated roofing tiles truly lightweight! Concrete and clay roofs can weigh up to 15 lbs per squarefoot! In fact stone coated roof tile is even lighter than most high-grade asphalt roof shingles.
Q : Is stone metal roofing tile durability ?
A :Yes, The average life of a non-metal roof is 17 years. Asphalt can require re-roofing every 10 to 20years, often sooner. But a metal roofing system offers unmatched durability, lasting 2 to 3 times longer.
Q : How long does it take to install a steel roof?
A :Usually only a few days. The complexity of the buildings roofs cape is the primary factor in determining the time required. Complex roofs require more time than basic designs.