Dressing Tray Lid Composite En124 Manhole Cover
Dressing Tray Lid Composite En124 Manhole Cover
Dressing Tray Lid Composite En124 Manhole Cover
Dressing Tray Lid Composite En124 Manhole Cover
Dressing Tray Lid Composite En124 Manhole Cover

Dressing Tray Lid Composite En124 Manhole Cover

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Wuxi High Mountain Hi-Tech Development Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

Product Description

Dressing Tray Lid Composite En124 Manhole CoverDressing Tray Lid Composite En124 Manhole CoverDressing Tray Lid Composite En124 Manhole Cover

Dressing Tray Lid Composite En124 Manhole Cover

Product Name

Manhole cover

Material

Ductile iron GGG500/7,Gray iron,etc

Dimensions

DN400-1000mm

Surface

bitumen/epoxy painting/etc /or as your request

Coating

Black bitumen painting;

Coating as per customers' requirements

Load capacity

A15,B125,C250,D400,E600,F900

Color

Grey/Black/as your request

Application

Building Industry machinery

Feature

Anti-theft, Auti-rust, Less noise, Long time Sevice,Durable, Easy to assemble & Dismantle

Note

OEM service is available

Package

Wooden pallets or steel pallets, or as your request

 

Product Description

 

1) Product information: 
Manhole Covers are manufactured for construction and public use. Manhole Covers shall be smooth and free from sand holes, blow holes, distortion or any other defects 
2) Material 
a) Ductile Iron GGG500-7 & 400-12 
b) Grey Iron GG20

3) Designs .
a) EN124 A15, B125, C250, D400, E600 and F900 
b) A60005 for casting design 
c) Major standards designs available 
d) As per customers' drawings or samples 
4) Process 
c) Molding boards 
d) Green sand with hand molding 
5) Coating 
a) Cold applied black bitumen 
b) Without coating 
c) Coating as per customers' requirement 
6) Different accessories are available 

Ductile Iron Manhole Cover

and Grating

EN124:1994

Material: GGG500-7

Class

Application

Dimension (Frame mm)

A15

Pedestrians, Pedal Cyclists

Dia760

B125

Footways, Pedestrians, Car parks

290*290, dia800 ...

C250

Kerbside channel of roads

700*700, 600*800 ...

D400

Road, hard shoulders etc.

850*850, 920*920 ...

E600

Docks, aircraft pavements etc.

as per your demands

F900

Aircraft pavements etc.

as per your demands

Company Information

High Mountain Pipe is dedicated to the manufacturing and sales of various kinds of plastic pipes, fittings, valves, related plumbing equipments, etc. And we can provide professional solution method for complete pipe system. The production and sales volume of leading products of PE water supply pipes and HDPE drainage pipes ranks among the highest in the industry.

 

The company covers an area of about 200,000 square meters and has 6 workshops, 30 production lines, 300 workers, and 200,000 tons annual ability. It is a comprehensive enterprise integrating science, industry and trade. The industries involved are: research, production, development, manufacturing, and polymer materials of plastic pipes. All products meet the requirements of national inspection standards or enterprise inspection standards.

Dressing Tray Lid Composite En124 Manhole Cover
 

 

Certifications

Dressing Tray Lid Composite En124 Manhole CoverDressing Tray Lid Composite En124 Manhole CoverDressing Tray Lid Composite En124 Manhole Cover 

Logistics and PAY

Dressing Tray Lid Composite En124 Manhole Cover

 

1. FedEx/DHL/UPS for samples & small quantity order delivery,Door to Door.
2. By Air or by Sea for batch goods,for FCL; Airport/ Port receiving.
3. Delivery Time:5-7 days for samples; 15-20 days for batch goods.

 

FAQ


Q: How long is your delivery time?

Re: A: Generally it is 3-5 days if the machines are in stock. If big worshop fitting machine or special machine, it will take about   15 to 40 days.

 

Q2: Which payment is available for your company?

Re: T/T, L/C or All trade insurance. You can choose the one which is convenient for you.

 

Q3: How and when can I get my goods after payment?

Re:For small quantity products,they will be delivered to you by international courier(DHL, FedEx,TNT etc.) or by air. Usually it will cost 3-5days that you can get the goods after delivery. For large quantity products, shipping by see is worthwhile. It will cost days to weeks to come to your destination port, which depends on where the ports is.

 

Q4:Can you design and produce special machines according to customer requirement ?

Re:Yes, we have strong technical capacity, can develop any new products by ourselves totally.

 

Q5:How can you guarantee the goods you offer is qualified?

Re: We always believe honesty and responsibility are basis of one company, so whatever products we provide for you all are qualified. We will have goods tested and provide COA before delivery for sure.

 

Q6:Is the price on this page correct?

Re: The listed price is only for reference, for latest price, pls contact us directly.

Main Products

Dressing Tray Lid Composite En124 Manhole Cover 

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Security & Protection > Roadway Safety > Other Roadway Products
Categories
Hi~