Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Wuxi High Mountain Hi-Tech Development Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

Product Description
HDPE hot  fusion fittings dn25mm dn1200mm  pipe abutting joint flange
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange
Product name HDPE Pipe fittings
Pressure SDR9, SDR11, SDR17, or as customized
Size DN20mm-800mm, or as requested
Features Convenient transportation, easy to intall
Material HDPE, Polyethylene
Executive ISO4427, GB/T13663, ISO9001, ISO14001
Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Thickened material, reliable connection

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Heat and cold resistance, wear and pressure resistance

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Beautiful appearance, smooth inner wall

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Product name Abutting joint flange
Product material 100%HDPE
Product colour Black
Connection type jointing or butting

 

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

1. High corrosion resistance, long service life.

2. PE has excellent chemical stability, good flexibility.
3. Light weight, easy to install and lower transport and maintenance.
4. Nontoxic, no Leakage, higher flow capacity.
5. Recycled and environment-friendly.
6. Applied to water supply, drainage, industrial liquid, municipal works, agricultural irrigation etc.
7. Factory price.

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Applications

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Company Information

High Mountain Pipe is dedicated to the manufacturing and sales of various kinds of plastic pipes, fittings, valves, related plumbing equipments, etc. And we can provide professional solution method for complete pipe system. The production and sales volume of leading products of PE water supply pipes and HDPE drainage pipes ranks among the highest in the industry.

 

The company covers an area of about 200,000 square meters and has 6 workshops, 30 production lines, 300 workers, and 200,000 tons annual ability. It is a comprehensive enterprise integrating science, industry and trade. The industries involved are: research, production, development, manufacturing, and polymer materials of plastic pipes. All products meet the requirements of national inspection standards or enterprise inspection standards.

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

 

Certifications

Iron Electrofusion Stub End And Long Fusion Abutting Joint FlangeIron Electrofusion Stub End And Long Fusion Abutting Joint FlangeIron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Logistics and PAY

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange1. FedEx/DHL/UPS for samples & small quantity order delivery,Door to Door.
2. By Air or by Sea for batch goods,for FCL; Airport/ Port receiving.
3. Delivery Time:5-7 days for samples; 15-20 days for batch goods.

FAQ

 

Q1: May I get one sample before placing order?

Re: Yes,Sample are available. For normal product, samples are for free and you just need to bear the fright; For those high value products, you just need to freight and certain product cost. When we both cooperate for some times or when you are our VIP customer, free sample will be offered when you need.

 

Q2: Which payment is available for your company?

Re: T/T, L/C or All trade insurance. You can choose the one which is convenient for you.

 

Q3: How and when can I get my goods after payment?

Re:For small quantity products,they will be delivered to you by international courier(DHL, FedEx,TNT etc.) or by air. Usually it will cost 3-5days that you can get the goods after delivery. For large quantity products, shipping by see is worthwhile. It will cost days to weeks to come to your destination port, which depends on where the ports is.

 

Q4:Is there any possible to use  my appointed label or package?

Re:Yes. If needed, we would like to use label or package according to your requirement.

 

Q5:How can you guarantee the goods you offer is qualified?

Re: We always believe honesty and responsibility are basis of one company, so whatever products we provide for you all are qualified. We will have goods tested and provide COA before delivery for sure.

 

Q6:Is the price on this page correct?

Re: The listed price is only for reference, for latest price, pls contact us directly.

Main Products

Iron Electrofusion Stub End And Long Fusion Abutting Joint Flange

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Pipe Fittings
Categories
Hi~