High Quality Construction Machinery Diesel Engine Parts Fuel Water Separator FS53014
Negotiable
Min.Order:1
High Quality Diesel Truck Engine Eco Fuel Filter Element 23401-1690
Diesel Recyclable Fuel Filter 23304-EV110 23304-EV150 23304-JAB50 92956472 60206777
Sinotruk Gearbox Transmission Hydraulic Suction Filter Oil Filter 0501.215.163
Bus Gearbox Oil Filter Suction Filter 7421324327 0501215163 42563106 1828379
Factory Supply Diesel Fuel Filter Kit L5091F Diesel Filter Replacement PF9906 Fuel Filter P550954
Type | Fuel Water Separator | ||||||
OEM Number | FS53014 69001 PF46079 | ||||||
Specification | Standard size; Custom size is available | ||||||
Materials | Filter paper, Poly urethane, rubber, metal meshes, Aluminum alloy cover, etc. | ||||||
Place of Origin | China Mainland | ||||||
Service | OEM & ODM | ||||||
MOQ | 12piece | ||||||
Supply Ability | 100,000pcs/Month | ||||||
Loading Port | Shanghai, Tianjin, Guangzhou, Ningbo | ||||||
Payment Term | TT, Westen Union, Moneygram, Alibaba Trade Assurance Order, L/C, etc | ||||||
Delivery Time | 7-25 Days according to customer's order quantity | ||||||
Packing | 1)Neutral packing box; 2)Making the packing boxes according to customer's requirements; |
1. Are you a trading company or manufacturer?
Re: We are professional manufacturer with factory in China, since 2010.
2. Can I get your products with our logo & design?
Re: Most of our products can be customized according to your requirements. Besides, it also needs to meet the MOQ of boxes.
3. Do u accept small order quantity or mixed container?
Re: Yes, of course we can accept it.
4. Could you supply samples to confirm the order?
Re: Yes, we are willing to offer free samples, but the shipping charges will be paid by buyer.
5. How can I get the quotation faster?
Re: Please email or calling us with your specification, quantity&detailed requirements. We wil check the cost and quote our best prices as soon as possible.
6. What's your Delivery Time?
Re: (1) For Stock goods, we will be send it within 7 days once we receive payment.
(2) Generally, the goods will be finished around 15-20 working days.
7. How to solve the quality problem?
Re: If the products are not comfort to customer sample or having quality problems, our company will be responsible to make a compensation for it.