Diesel Loader Engine Hydraulic Oil Filter Cartridge 287-16-11510 281-16-11290 For Komatsu
Negotiable
Min.Order:1
Diesel Truck Engine Steering Hydraulic Oil Filter Element CH5576 P550309 HF6162 4660604
Diesel Truck Engine Hydraulic Filter Cartridge A0004660204 A0004660604 A0011842225
High Quality Diesel Truck Engine Hydraulic Filter Cartridge 32/901701 P550148 HF6177
Diesel Excavator Loader Engine Hydraulic Filter Cartridge 3I2140 P173055 6635975 HF6182
Diesel Excavator Engine Hydraulic Filter Cartridge 7211191 H1070 P173491 HF6248
Diesel Excavator Engine Hydraulic Filter Cartridge 3I1101 1529253 PT9162 P550037 HF6305
Type | Hydraulic Filter | ||||||
OEM Number | HF6084 281-16-11290 287-16-11510 2811611510 H-5620 PT708-HD P551290 3I1240 1161212 175-49-02414 23B-16-11310 | ||||||
Specification | Overall Height:233mm; O.D:100mm; I.D:42mm; | ||||||
Materials | Filter paper, Poly urethane, rubber, metal meshes, Aluminum alloy cover, etc. | ||||||
Place of Origin | China Mainland | ||||||
Service | OEM & ODM | ||||||
MOQ | 12pieces | ||||||
Supply Ability | 100,000pcs/Month | ||||||
Loading Port | Shanghai, Tianjin, Guangzhou, Ningbo | ||||||
Payment Term | TT, Westen Union, Moneygram, Alibaba Trade Assurance Order, L/C, etc | ||||||
Delivery Time | 7-25 Days according to customer's order quantity | ||||||
Packing | 1)Neutral packing box; 2)Making the packing boxes according to customer's requirements; |
1. Are you a trading company or manufacturer?
Re: We are professional manufacturer with factory in China, since 2010.
2. Can I get your products with our logo & design?
Re: Most of our products can be customized according to your requirements. Besides, it also needs to meet the MOQ of boxes.
3. Do u accept small order quantity or mixed container?
Re: Yes, of course we can accept it.
4. Could you supply samples to confirm the order?
Re: Yes, we are willing to offer free samples, but the shipping charges will be paid by buyer.
5. How can I get the quotation faster?
Re: Please email or calling us with your specification, quantity&detailed requirements. We wil check the cost and quote our best prices as soon as possible.
6. What's your Delivery Time?
Re: (1) For Stock goods, we will be send it within 7 days once we receive payment.
(2) Generally, the goods will be finished around 15-20 working days.
7. How to solve the quality problem?
Re: If the products are not comfort to customer sample or having quality problems, our company will be responsible to make a compensation for it.