Fuel water separator FS1281 1677004C91 P550729 SFC190810 E8TZ-9N184A F2TZ9N184A uses for FORD F-350 Pickup
Negotiable
Min.Order:1
China Filter Factory Hydraulic Filter Cartridge HF28857 Hydraulic Filter BT8833
Manufacturer Wholesale Excavator Engine Spare Parts P502224 Hydraulic Oil Filter HF28885
Manufacturer Wholesale Hydraulic Oil Filter 294073005 for Concrete Pump Trucks Hydraulic Filter
Industrial Hydraulic Filter Element Hydraulic Oil Filter cartridge 5801445572
Product Type | Fuel water separator for pick up | ||||||
OEM Number | FS1281 1677004C91 P550729 SFC190810 E8TZ-9N184A F2TZ9N184A | ||||||
Specification | Standard size; Custom size is available | ||||||
Materials | Filter paper, Poly urethane, rubber, metal meshes, Aluminum alloy cover etc. | ||||||
Place of Origin | China Mainland | ||||||
Service | OEM & ODM | ||||||
MOQ | 10pieces | ||||||
Supply Ability | 100,000pcs/Month | ||||||
Loading Port | Shanghai, Tianjin, Guangzhou, Ningbo,Wuhan etc. | ||||||
Payment Term | TT, Westen Union, Moneygram, Alibaba Trade Assurance Order, L/C, etc | ||||||
Delivery Time | 7-25 Days according to customer's order quantity | ||||||
Packing | 1)Neutral packing box; 2)Making the packing boxes according to customer's requirements; |
1. Are you a trading company or manufacturer?
Re: We are professional manufacturer with factory in China, since 2010.
2. Can I get your products with our logo & design?
Re: Most of our products can be customized according to your requirements. Besides, it also needs to meet the MOQ of boxes.
3. Do u accept small order quantity or mixed container?
Re: Yes, of course we can accept it.
4. Could you supply samples to confirm the order?
Re: Yes, we are willing to offer free samples, but the shipping charges will be paid by buyer.
5. How can I get the quotation faster?
Re: Please email or calling us with your specification, quantity&detailed requirements. We wil check the cost and quote our best prices as soon as possible.
6. What's your Delivery Time?
Re: (1) For Stock goods, we will be send it within 7 days once we receive payment.
(2) Generally, the goods will be finished around 15-20 working days.
7. How to solve the quality problem?
Re: If the products are not comfort to customer sample or having quality problems, our company will be responsible to make a compensation for it.