Korea Auto Engine Fuel Water Separator 31945-7L002 FS19593 P551034 PL270/7X
Negotiable
Min.Order:1
Chinese Factory Price Supply Excavator Engine Parts FS19580A Fuel Water Separator Filter BF9894
Wholesale 8N9803 Fuel Filter P559803 Fuel Water Separator Filter Assembly 6N7617
Wholesale Excavator Engine Diesel Parts RE551507 Fuel Water Separator Filter RE551507
High Quality Engine Diesel Parts Fuel Filter RE551508 Fuel Water Separator Filter
Fuel water separator FS1098 5319680 FH21462 for 150D 200E 215E 920E 926E engine
Type | Fuel Water Separator | ||||||
OEM Number | 31945-7L002 FS19593 S3226P P551034 PL270/7X 95412 13050733 HG1500080146 40040300022 K1006520 K1006530 324957001 ABPS3226FL02 1685159C91 PS9794 7306AAP00040N F66026 F65996 FS550554 4812159481 4812160481 030.1105010 54166-3438 | ||||||
Specification | Standard size; Custom size is available | ||||||
Materials | Filter paper, Poly urethane, rubber, metal meshes, Aluminum alloy cover, etc. | ||||||
Place of Origin | China Mainland | ||||||
Service | OEM & ODM | ||||||
MOQ | 24pcs | ||||||
Supply Ability | 100,000pcs/Month | ||||||
Loading Port | Shanghai, Tianjin, Guangzhou, Ningbo | ||||||
Payment Term | TT, Westen Union, Moneygram, Alibaba Trade Assurance Order, L/C, etc | ||||||
Delivery Time | 7-25 Days according to customer's order quantity | ||||||
Packing | 1)Neutral packing box; 2)Making the packing boxes according to customer's requirements; |
1. Are you a trading company or manufacturer?
Re: We are professional manufacturer with factory in China, since 2010.
2. Can I get your products with our logo & design?
Re: Most of our products can be customized according to your requirements. Besides, it also needs to meet the MOQ of boxes.
3. Do u accept small order quantity or mixed container?
Re: Yes, of course we can accept it.
4. Could you supply samples to confirm the order?
Re: Yes, we are willing to offer free samples, but the shipping charges will be paid by buyer.
5. How can I get the quotation faster?
Re: Please email or calling us with your specification, quantity&detailed requirements. We wil check the cost and quote our best prices as soon as possible.
6. What's your Delivery Time?
Re: (1) For Stock goods, we will be send it within 7 days once we receive payment.
(2) Generally, the goods will be finished around 15-20 working days.
7. How to solve the quality problem?
Re: If the products are not comfort to customer sample or having quality problems, our company will be responsible to make a compensation for it.