High Quality Truck Fuel Filter Fuel Water Separator FS20091 BF9893 11-9954
Negotiable
Min.Order:1
Cheap Diesel Excavator Engine Spin-on Fuel Filter Cartridge 65.12503-5033A
China Factory Excavator Engine Cartridge Fuel Filter 65125035033A FF5688 R010019
High Quality Diesel Excavator Engine Spin-on Fuel Filter Cartridge 319-0844
Manufacturer Diesel Excavator Engine Spin-on Fuel Filter Cartridge 65.12503-5100
Construction Machinery Diesel Truck Engine Cartridge Fuel Filter 319-0844 FF63052NN
Diesel Excavator Engine Fuel Filter 320/07394 320-07394 For 2CX 3CX 4CX Backhoe Loader
Type | Fuel Filter | ||||||
OEM Number | 11-9954 119954 FS20091 12-9954 BF9893 | ||||||
Specification | Standard size; Custom size is available | ||||||
Materials | Filter paper, Poly urethane, rubber, metal meshes, Aluminum alloy cover, etc. | ||||||
Place of Origin | China Mainland | ||||||
Service | OEM & ODM | ||||||
MOQ | 24pcs | ||||||
Supply Ability | 100,000pcs/Month | ||||||
Loading Port | Shanghai, Tianjin, Guangzhou, Ningbo | ||||||
Payment Term | TT, Westen Union, Moneygram, Alibaba Trade Assurance Order, L/C, etc | ||||||
Delivery Time | 7-25 Days according to customer's order quantity | ||||||
Packing | 1)Neutral packing box; 2)Making the packing boxes according to customer's requirements; |
1. Are you a trading company or manufacturer?
Re: We are professional manufacturer with factory in China, since 2010.
2. Can I get your products with our logo & design?
Re: Most of our products can be customized according to your requirements. Besides, it also needs to meet the MOQ of boxes.
3. Do u accept small order quantity or mixed container?
Re: Yes, of course we can accept it.
4. Could you supply samples to confirm the order?
Re: Yes, we are willing to offer free samples, but the shipping charges will be paid by buyer.
5. How can I get the quotation faster?
Re: Please email or calling us with your specification, quantity&detailed requirements. We wil check the cost and quote our best prices as soon as possible.
6. What's your Delivery Time?
Re: (1) For Stock goods, we will be send it within 7 days once we receive payment.
(2) Generally, the goods will be finished around 15-20 working days.
7. How to solve the quality problem?
Re: If the products are not comfort to customer sample or having quality problems, our company will be responsible to make a compensation for it.