UHMWPE chain track profile polymer conveyor chain tensioner guide
Negotiable
Min.Order:1
Type CKG14H wear resistance uhmwpe elevator guide rail alignment in china
Abrasion Resistance UHMW-PE Plastic Guide Rail / Slide Way for Engineering
UHMW-PE chain guides,polyethylene uhmw roller chain guides,Plastic UHMWPE polyethylene guide rail
uhmwpe plastic conveyor chain and belt profile side guide rail manufacturer
chain guide
Material | Ultra High density polyethylene linear guide rail |
Color | Green,blue or customized |
Techniques | Compression moulding |
Feature | 1. Wear resistant; 2. Impcat resistant; 3. Easily machined. |
Standard Size | customized according to drawing |
Application | Link chain,machine tool,etc. |
Payment | 50% T/T in advance, 50% T/T before delivery |
Place of origin | Jiangsu, China (Mainland) |
Delivery | According to the orders, usually 5-15 days |
Property | Unit | UHMWPE |
Physical Properties |
|
|
Density | g/cm3 | 1 |
Water Absorption | % | < 0.01 |
Maximum Working Temperature | ℃ | 90 |
Minimum Working Temperature | ℃ | -269 |
Mechanical Properties | - | - |
Breaking Strength | N/mm2 | >39 |
Ultimate Tensile Strength | MPa | 38 |
Break Elongation | % | 350 |
Impact Strength(v notch) | mJ/mm2 | >132 |
Bending E-Modulus | MPa | 760 |
Shear Strength | MPa | 33 |
Ball Indent. Hardness | N/mm2 | >41 |
Shore Hardness | Shore D | 65 |
1. Q: What color can you make?
A: Usually we can make the regular color, like green, blue, black, yellow, grey and so on. Or you can offer the pantone color number for reference to produce.
2.Q: What is your MOQ?
A: It depends on the color, nature white uhmwpe sheet’s MOQ is 100kgs colored uhmwpe sheet’s MOQ is 300kgs.
3. Q: What is your delivery time?
A: It depends on the volume, usually it is about 7 days.
4. Q: How can I get a sample?
A: Small size of sample are free, you only need to pay for the shipping cost, or you can provide your UPS, DHL, Fedex, TNT courier account to us. Customized size of sample should be charged.
5. Q: What is your payment ?
A:50% T/T in advance, 50% balance before shipment. Other terms negotiable.