name | ABS Plastic Black Front Assembly Bumper Grill Grille | Quality:abs | 100% tested |
Car Make | For hilux | Packing | Bubble bags and EPE |
Size | OEM | Warranty | 1 year |
Weight | OEN | Product | OEM ,ODM |
Technolog | hand polishing | delivery time | 20-40 days after receipt of deposit. |
Payment | T/T:Pay 30% deposit once confirm the order, Pay 70% balance before shipment. | Factory Address | No. 1389, Guangchen East Road, Zhongluotan Town, Baiyun District, Guangzhou, Guangdong, China |
Specifications
Specifications:
1.3' or 2.5' stainless steel pipe can be available.
2.Brackets, bolts and nuts, instruction sheet included.
3.Strong Export Packing
4.DIY easy Install
5.Made in China.
6.customized design requests
7.20-40 Minutes for installation
Shaoxing big house Co., Ltd. is located in Asia's largest auto parts. We are a professional manufacturer of auto parts,
set design, development, manufacturing as a professional manufacturer.We focus on a series of fashion accessories,
a wide range of diversity, reasonable price and on-time delivery.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Inquiry --------->> Quotation -------->> Price resonable ------->> Check with specification ----->> Proforma Invoice sent ------------>> Payment made ------->> Product shipment ------->> Customer
Q2.How long is the delivery date?
Sample order will be shipped within 5 working days after payment received, 20 to 40 working days for bulk order.
Q3.May I visit your factory?
Yes,you are welcome to visit our factory.No. 1389, Guangchen East Road, Zhongluotan Town, Baiyun District, Guangzhou, Guangdong, China.
Q4. Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q5.What The Step of Production
Cutting→Bending→Semi-product welding→Semi-product
sanding→Finished product welding→Finished product
sanding→Painting→Finished product polish→Packing