steel building garbage chute door
USD $111 - $221 /Unit
Min.Order:1 Unit
Guangzhou longcom technical company
Specifications
Garbage chute system (longcom brand) STAINLESS STEEL steel 500-600 mm Dia,sheet is 1.2 or 1.5mm thickness,
around 600mm hoper,intake ,400-500mmintake door,500-600mm output door ,
top inspection400-400m door ,suction fan,control self closed single door system ,anti-fire 2-layer door.
Custiomation option could be:
Stainless steel grade 304 refuse/garbage chute to be include by clients choice:
1. control automatic system ,
2.washing and
cleaning system,
3.fresh air extraction fans,
4.entry ports at each floor,
5.bins,
6.garbage compactor.
1-Garbage chute system STAINLESS STEEL 600 mm dais 1.2 or 1.5 mm thick of the material as custome choice or building hieght
A) - The chute will be round duct started from the garbage room up to the roof
B) - The duct has opining on each floor with throat for throwing the garbage, the opining of the throat shall be the same size of the chute door.
C) - The material of the chute round duct will be as the client requirement wither (stainless steel 304 2B grade, 1.2 mm )
2- Stainless steel doors self closing type with rubber pad) size 45 x 45 - 0.7 mm thick, with excess panel 200mm fixed for indicator light.
A) - The doors shall fix on each floor or customized to fix
B) - The door shall serve the building apartments to throw the garbage bags not debris without package
C) - The door made by 100% of stainless steel with gas spring for door self closing
3- Excess door 600 x 600 mm on the top of the chute to serve inspection and cleaning
The excess door shall be in the top of the chute on the roof or at the last floor to serve the all cleaning systems (water pump, solenoid valve, sanitizing unit, and the brush)
4- Angle 38 mm for garbage chute support on each floor.
The angle supports to hold the chute on each floor.
5- Cutoff door in the end of the chute
The cutoff door shall fix in the bottom of the chute its for cut off and closing the chute from the bottom
6- Electrical control panel to control the chute system
The electrical control panel for controlling the system like locking the doors
DESCRIPTIONS:
Garbage chute system (longcom brand) STAINLESS STEEL or it can be made as customer choice or building height requirement:
A) - The chute will be round duct started from the garbage room up to the roof
B) - The duct has opining on each floor with throat for throwing the garbage, the opening of the throat shall be the same size of the chute door.
C) - The material of the chute round duct will be as the client requirement with(stainless steel 304 2B grade, 1.2 mm or 1.5 mm ),
D) - the inside will be mirror smooth fabricated asure the working conditions .