Hot Dip Galvanized Drainage Rain Water Steel Grating
Negotiable
Min.Order:1
Factory work shop steel grating zinc steel hot galvanizing grating steel driveway grates
Manufactory ditch cover steel frame lattice steel grating weight hard steel driveway grates grating
Supply inspection platform grid-steel support catwalk steel grating steel driveway grates grating
Hot Dipped Galvanized Sidewalk Rain Water Used Steel Grating
Professional Manufacture Galvanized Steel Gratings Trench Cover/Construction Wall
Hot Dip Galvanized Drainage Rain Water Steel Grating
1. Material:
Low Carbon Steel or Stainless Steel
2.Surface Treatment:
Untreated, Painting or Hot Dipped Galvanizing
3.Specifications:
--Bearing Bar (Load Bar) Specifications (mm):
The specification of plain type and serrated type bearing bar is 20 x 3 to 100 x 10.
The specification of I-section type is 25 x 5 x 3, 32 x 5 x 3, 38 x 5 x 3, 40 x 5 x 3, 50 x 5 x 3, 50 x 7 x 4, 55 x 7 x 4, 60 x 7 x 4, 65 x 7 x 4, 70 x 7 x 4, 75 x 7 x 4, etc.
--Bearing Bar Pitch (center to center):
12.5, 15,25, 30, 30.16, 32.5, 34, 40, 41.25, 45, 50, 60, 60.32, 80, 100 mm etc, also be according to client's requirement and 30, 40, 60mm are recommended,
America standard is available <1' x 3/16', 1 1/4' x 3/16', 1-1/2' x 3/16', 1' x 1/4', 1-1/4' x 1/4', 1 1/2' x 1/4'(19-w-4),(19-w-2) and so on.>
--Cross Bar Pitch (center to center):
38, 50, 76, 100, 101.6mm etc, also be according to client's requirement and 50, 100mm are recommended, America standard is available.
4.Steel grating standards:
A. China: YB/T4001-1998
B. USA: ANSI/NAAMM (MBG 531-88)
C. UK: BS4592-1987
D. Australia: AS1657-1988
E: Japan: JIS
Guangzhou Shengcheng Sieve Co.,Ltd
Our leading products include: Wrought iron fence, chain link fence, temporary fence, metal sieve mesh , and so on. Welcome to have a visit to us at any time.
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: 30% T/T in advance ,balance before shippment.