Heater Control Valve for BMW E36 328i M3 323i 328is 64118375792 64118391419 New
Negotiable
Min.Order:1
Shanghai Kison Auto Part Co., Ltd.
New Right Rear Tail Light For VW Passat Saloon 2001 02 03 04 2005 3B5945096AE
YG350 HAVC Heater Control Valve FOR Ford Explorer Ranger Aerostar F87Z18495AA
Tail Light Taillight Brake Rear Light Housing Left LH For 93-98 VW Golf Mk3 New
Tail Light Taillight Brake Rear Light Housing Right RH For 93-98 VW Golf III Mk3
For 2000-2002 JAGUAR S-Type Ford Heater Control Water Valve HVAC XR822975 NEW
FOR SAAB 9-5 2.3 3.0 ARC LINEAR AERO HEATER BYPASS CONTROL VALVE 90 566 947 NEW
Name: Heater Control Valve
OE Number: 64118375792
Application:
For 1991-1992 BMW 318I BASE CONVERTIBLE 2-DOOR
For 1994-1998 BMW 318I BASE CONVERTIBLE 2-DOOR
For 1991-1998 BMW 318I BASE SEDAN 4-DOOR
For 1991-1998 BMW 318IS BASE COUPE 2-DOOR
For 1992-1995 BMW 320I BASE SEDAN 4-DOOR
For 1998-1998 BMW 323I BASE CONVERTIBLE 2-DOOR
For 1997-1998 BMW 323I BASE SEDAN 4-DOOR
For 1991-1995 BMW 325I BASE CONVERTIBLE 2-DOOR
For 1991-1991 BMW 325I BASE COUPE 2-DOOR
For 1991-1997 BMW 325I BASE SEDAN 4-DOOR
For 1991-1995 BMW 325IS BASE COUPE 2-DOOR
For 1996-1998 BMW 328I BASE CONVERTIBLE 2-DOOR
For 1996-1998 BMW 328I BASE SEDAN 4-DOOR
Packing Details:
Natural Blank Paper Box, Plastic Bag (Optional), No Logo, any specail requirement like OEM desgin or Customer Logo please contact us before ordering.
Warranty:
12 Months, defected product within warranty period will have free replacement or refund.
1. What product are you supplying?
We are currently offering more than 10,000 different auto parts, our main lines are: Switch, Sensor, Door Handle and Engine Coolant Parts.
2. Are you a factory or trading company?
We are manufacturer of auto switches, we also offer other parts which are produced in our cooperated factories.
3. Can I visit you?
Yes, warmly welcome to visit our head office in Shanghai, and factory in Zhejiang province.
4. How do you ensure your quality?
Our factory has a well organized system to control quality according to ISO9000 requirement, 100% testing process will be made before any order delivered. After that, we offer 12 months warranty for all our products, there is no worries to get replaced or refund at any special situation you met.
5. What is your MOQ and delivery time?
We have stock for most of products, NO MOQ required, any small orders under 50pcs will be shipped immediately.
6. Can you offer a lower price?
If you have a much bigger quantity order that is out of listing suggested range, please contact us for more competitive price!
7. Do you offer OEM production?
We are happy to receive any inquiry of customer special design. If you have any new design to develop or you have some parts couldn't find the existing production in China, welcome to contact us!
A: Inquiry Replied
Your inquiry related to our products or prices will be replied in 24 hours. We have staff speaks English, Spanish, French, German, you can send inquiry in your native language and get replied in same language.
B: Order Processing
Orders will be processed within an agreed time. Normally, a small order less than 50pcs will be shipped in 7 days, bigger order need negotiate to arrange a reasonable production time, we 100% ensure delivery time once it is confirmed both sides.
C: Out of Product Line
In order to make your purchasing more efficiently, we can help you to search items that are not in our product lines and ship together, we have plenty of Chinese resources.
Thank you for your business!