Rail maintenance clamp for Railway Track
Negotiable /Piece
Min.Order:1 Piece
Anyang Railway Equipment Co., Ltd
Anyang Railway Equipment Co., Ltd was founded in 2001, it has 18 modern professional production lines, 800 employees, more than 1,000 sets of various equipment, professional equipment, inspection, testing, and test equipment. It has cast, rolling, elastic clips, fish plate, baffle, rubber, anti-corrosion, heat treatment, standard parts, screw spikes, gauge rods, etc 12 production workshops.
Since its establishment, Anyang Railway Equipment Co., Ltd has become a key international player in the Railway fixing construction materials market, it has been supplying millions of components to global industry leaders in the railway sector.
Main Products
Railway fastening systems: E-clip rail fastening system, SKL clip rail fastening system, Spring blade rail fastening system, KPO clip rail fastening system, etc.
Rail fasteners: rail fish plates, rail tie plates, elastic rail clips, screw spikes, rail bolts, rail anchors, rails pads, rail shoulders, etc.
Rail joints: standard rail joints, joggled rail joints, compromised rail joints and fish bolts, etc.
Railway Sleeper: Railway composite sleeper(railroad synthetic sleeper)
Rail maintenance clamp, also called emergency railroad track repair Tool, rail rescue device or rail rescuer, rail C-clamp, it is a temporary rescue tool widely used in the railway engineering department. In the emergency situation of a rail break, in order for the train to pass normally, the corresponding type of rail fish plate (rail joint splint) can be buckled on both sides of the broken steel rail, and put the first aid device from the bottom of the rail to the lower part of the fishplate so that the top surface of the rail first aid device is on both sides of the temporary fishplate. Two first aid devices are put on the rail joint bars at the same time as a group, and the first aid devices are located at 100mm at the end of the track fish plates respectively, and the emergency rescue device bolts are locked with the quick wrench provided immediately. Then the train can pass normally at a lower safe speed.
Features of Rail maintenance clamp:
1. Reinforce the welding strips judged to be various types of damage on the line.
2. Perform emergency reinforcement treatment when the rail or welding strip is broken.
3. The damages at the welding strips of thermite welding, gas pressure welding and resistance welding can be clamped firmly. The damaged rails between the sleepers or on the sleepers can be clamped. It is formed by precision casting of alloy steel, with beautiful appearance, light weight, convenient carrying, impact resistance and long service life.
4. Stock a spare set at the bottom of each kilometer mark and half kilometer mark rail, which is very convenient and timely when used.
5. When the rail is broken, the operator does not need to bring the drum splint and first aid device to the site, which reduces the labor intensity of the operator and greatly shortens the time for handling the broken rail.
6. After the damaged rail reinforcement is installed, the normal operation of the train can be ensured.
The rail emergency device is convenient and flexible to load and unload, the clamping is firm and reliable, and the tool box is easy to carry. It is a convenient and reliable emergency repair tool for the railway engineering department to temporarily rescue rail fractures.