hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks
hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks
hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks
hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks

hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks

USD $450 - $780 /Ton

Min.Order:1 Ton

Supply Ability:
1000 Ton / Tons per Month
Port:
Tianjin Shanghai Guangzhou Qingdao etc
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
China
Thickness:
2, 15
Application:
Structure Pipe
Technique:
Extruded
Alloy Or Not:
Is Alloy
Outer Diameter:
8 - 100 mm

Shandong Tianzan Steel Co., Ltd.

Business Type: Agent
Main Products: Seamless Steel Pipe ,Welded Steel Pipe ,Galvanized Pipe ,Stainless Steel Pipe

Product Details

Products Description
Product
hot sale ERW Steel Pipe,ERW welded Carbon Steel Pipe For oilworks
Size
4~100mm
Thickness
0.2mm~15mm
Unit length
3m, 5.8m, 6m, 11.8m, 12m, 13.5m or as per customers' request
Material
A53,ST33,A283,A135,ST37,A53,A106,ST35,A179,A214,A192,A226,A315,ST42 A106-B
surface
Bare surface,varnish painting,galvanizing,other painting as per customers' request
Packing
In bundles with steel strip or in loose, non-woven fabrics packings or as per customers' request
Application
Civil engineering, architecture, steel towers, shipyard, scaffoldings, struts, piles for suppression of
landslide and other structures
Company Profile
Our Advantages
Steel grade
 GB
JIS
ASTM
DIN
Brand
Brand
Brand
Steel number
Steel number
Material number
Standard
Carbon

(Q235)
GGP
G3452
(A53- F)

(St33)

1.0033

DIN1626
Steel pipe
STPY41
G3457
A283-D








10

STPG38

G3454
A135-A

(St37)

1.011

DIN1626
A53-A
STPG38
G3456
A106-A
St37-2
1.0112
DIN17175

STS38

G3455
A179-C

St35.8

1.0305

DIN17175
A214-C

STB33

G3461
A192

St35.8

1.0305

DIN17175
A226
STB35
G3461
St35.8
1.0305
DIN17175

  20

STPG42

G3454
A315-B
(St42)
1.013

DIN1626
A53-B
St42-2
1.0132
Low alloy
Steel pipe
STS49
G3455

A210-C
St52.4
1.0832
DIN1629/4
Steel pipe
STPT49
G3456
St52
1.0831
DIN1629/3
Manufacturing Technique
packaging and shippment
FAQ
Q1: Can I have a sample?Is it free?
A: Yes,sample is offered for free, but freight shall be charged by customer.
Q2: What about the
lead time?
A: Normally 7-10 working days for normal specification,2-5days if we have in stock.
Q3: Do you have MOQ limit?A:It depends on products, normally we can do as client requires.
Q4: What about your payment term?
A:T/T or L/C,Western Union, it can be negotiated.
Q5: What is your warranty?A:Mill test certificate,SGS certificate, MTC certificate, shipping inspection or any thirs
party as you need.
Contact us

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~