hot sale plastic paragliding helmet mold
USD $1,000 - $11,000 /Set
Min.Order:1 Set
Taizhou Huangyan Chenhang Mould Factory
Why choose us?our advantages
1.Strict quality control to meet customer's requirements.
2.Competative price to save cost for customer.
3. Good After-sale Service,we'll provide technical support for a long period.
4. Rich experience for export mould.
5.Dunctual delivery to produce products in time for customer.
Some details of mould | |
Name | hot sale plastic paragliding helmet mold |
Mould Material | NAK80,S136,2316,2738,H13,5CrNiMo,718H,P20,40Cr,60#,45# etc |
Product Material | PP,PE,PC,PA,PS,PU,PVC,PMMA,ABS etc |
Cavity No. | Single or multi |
System Of Runner | Hot runner,Cold runner,Pin-point gate,Submarine gate, etc |
Ejector Type | Ejector pin,Air gate,Ejector plate,Hydro-cylinder,etc |
Term Of Mould Production | 30days- 45days |
Guaranteed Number Of Cycles | 300,000-3,000,000 closing |
Mould Design Software | Ug,Proe,Solidworks AotoCAD,Moldflow,ect |
Mould Produce Process | ||
1 | Product Design | Customer send us the product drawing directly or we draw the product according to the sample,then we send customer the product drawing to confirm |
2 | Mould Design | We'll start to design mould after the product drawing confirmed,then send customer the mould drawing to confirm |
3 | Mould Making | The mould start to make after the mould drawing confirmed,the process include prepare steel,rough cut,finish machining,assembly etc |
4 | Mould Test | we'll test the mould after mould assembly,then we'll send customer samples and video of mould test to confirm |
5 | Final Process | The mould start to polish if the sample is ok,and make grain,nitridation or chroming if customer required |
6 | Mould Test | We'll test the mould again after polishing,then send customer the final sample and video of mould test to confirm |
7 | Mould Packing | The mould stard to pack with wooden case after the final sample confirmed, then the mould will be sent to port and waiting for shipping |
Taizhou Huangyan Chenhang Mould Factory is a professional company engaged in mould design, manufacturing & producing, We are specialized in plastic injection mould,such as commodity mould,electronic products mould,auto & motorcycle accessories mould etc.
Most of our moulds exported to Japan,Germany,Holland,Spain,Russia,Israel,Egypt,Arab,Brazil,Mexico,Philippines,india and other Europe & America countries.welcome you to visit our website: to learn more information.
Chenhang Mould Workshop
Chenhang Mould Certifacation
Chenhang Mould Package
Chenhang Mould Operating Steps
1.Unscrew the bolt to take down the Connection Block.
2.The cooling channel connected by Diffluent Block.
Chenhang Mould Quality Control
1.Mould Material Q/C
a) mould steel checking (hardness,flaw detection)
b) mould spare parts checking (hardness,size)
2.Mould Making Process Q/C
a) design checking ( part design,mould desig,mould enginering drawing)
b) mould size checking (according to drawing)
c) mould testing (check mould working,sample)
Attention pls:
Pease offer the following information when you send us the mould inquiry
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) standard mould base or not.
d) runner system you want(cold or hot)
Contact Us
Our location on map
The time cost from other city
1.From Ningbo by train 1 hour.
2.From Yiwu by bus 3 hours.
3.From Shanghai by train 4 hours.
4.From Guangzhou by air 2 hours.
Please feel free to contact with us if you have any inquiry for Plastic Injection mould . Thank you !