cheap plastic children toy car mould
cheap plastic children toy car mould
cheap plastic children toy car mould
cheap plastic children toy car mould
cheap plastic children toy car mould
cheap plastic children toy car mould

cheap plastic children toy car mould

USD $1,100 - $15,000 /Set

Min.Order:1 Set

Supply Ability:
40 Set / Sets per Month
Port:
Ningbo or Shanghai
Payment Terms:
T/T Credit Card

Quick Details View All >

Brand Name:
CHENHANG MOULD, CHENHANG
Place of Origin:
Zhejiang, China
Model Number:
CH-L-404
Product Material:
Steel
Shaping Mode:
Plastic Injection Mould

Taizhou Huangyan Chenhang Mould Factory

Business Type: Business Service (Transportation, finance, travel, Ads, etc)
Main Products: Furniture Mould ,Dustbin & bucket mould ,Tableware mould ,

Product Details

 

Product Description

 

Why choose us?our advantages

1.Strict quality control to meet customer's requirements.

2.Competative price to save cost for customer. 

3. Good After-sale Service,we'll provide technical support for a long period.

4. Rich experience for export mould.
5.Dunctual delivery to produce products in time for customer.

 

Some details of mould
Namecheap plastic children toy car mould
Mould MaterialNAK80,S136,2316,2738,H13,5CrNiMo,718H,P20,40Cr,60#,45# etc
Product MaterialPP,PE,PC,PA,PS,PU,PVC,PMMA,ABS etc
Cavity No.Single or multi
System Of RunnerHot runner,Cold runner,Pin-point gate,Submarine gate, etc
Ejector TypeEjector pin,Air gate,Ejector plate,Hydro-cylinder,etc
Term Of Mould Production30days- 45days
Guaranteed Number Of Cycles300,000-3,000,000 closing
Mould Design SoftwareUg,Proe,Solidworks AotoCAD,Moldflow,ect

 

   

Mould Produce Process
1Product Design

Customer send us the product drawing directly or we draw the product

according to the sample,then we send customer the product drawing to confirm

2Mould Design

We'll start to design mould after the product drawing confirmed,then

send customer the mould drawing to confirm

3Mould Making

The mould start to make after the mould drawing confirmed,the process

 include prepare steel,rough cut,finish machining,assembly etc

4Mould Test

we'll test the mould after mould assembly,then we'll send customer samples

 and video of mould test to confirm

5Final Process

The mould start to polish if the sample is ok,and make grain,nitridation or

 chroming if customer required

6Mould Test

We'll test the mould again after polishing,then send customer the final

sample and video of mould test to confirm

7Mould Packing

The mould stard to pack with wooden case after the final sample confirmed,

then the mould will be sent to port and waiting for shipping

 

 cheap plastic children toy car mouldcheap plastic children toy car mould

cheap plastic children toy car mouldcheap plastic children toy car mould

Company Information

       Taizhou Huangyan Chenhang Mould Factory is a professional company engaged in mould design, manufacturing & producing, We are specialized in plastic injection mould,such as commodity mould,electronic products mould,auto & motorcycle accessories mould etc.

      Most of our moulds exported to Japan,Germany,Holland,Spain,Russia,Israel,Egypt,Arab,Brazil,Mexico,Philippines,india and other Europe & America countries.welcome you to visit our website: to learn more information.

cheap plastic children toy car mould

Chenhang Mould Workshop

 

Chenhang Mould Certifacation

cheap plastic children toy car mould

Packaging & Shipping

Chenhang Mould  Package

 

FAQ

Chenhang Mould Operating Steps

1.Unscrew the bolt to take down the Connection Block.

2.The cooling channel connected by Diffluent Block.

 

Our Services

Chenhang Mould Quality Control

1.Mould Material Q/C

a) mould steel checking (hardness,flaw detection)

b) mould spare parts checking (hardness,size)

2.Mould Making Process Q/C

a) design checking ( part design,mould desig,mould enginering drawing)

b) mould size checking (according to drawing)

c) mould testing (check mould working,sample)

Attention pls:

 Pease offer the following information when you send us the mould inquiry

a) product drawing or the sample photo with sizes.

b) mould steel you want to use.

c) standard mould base or not.

d) runner system you want(cold or hot)

Contact Us

Our location on map

 

The time cost from other city

1.From Ningbo by train 1 hour.

2.From Yiwu by bus 3 hours.

3.From Shanghai by train 4 hours.

4.From Guangzhou by air 2 hours.

Please feel free to contact with us if you have any inquiry for Plastic Injection mould . Thank you !

 

 

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~