Heavy equipment mud mats / HDPE crawler ground road mats / Construction access mat and temporary roads mat
USD $3 - $5 /Kilogram
Min.Order:500 Kilograms
Shandong Ningjin Xinxing Chemical Co,ltd.
HDPE temporary access matting and roads / crane construction road mats
China factory temporary road mats / hdpe mobile roadway / plastic road plates
Light duty road mat for temporary roadways construction site roadway mat
Road vehicles hollow ground protection mat / Construction site road access mats
Heavy equipment mud mats / HDPE crawler ground road mats / Construction access mat and temporary roads mat
Heavy equipment mud mats / HDPE crawler ground road mats / Construction access mat and temporary roads mat
Our heavy duty plastic track way panel is suitable for the heaviest of loads up to 200 tons and can be used to creat track ways and compound working areas for a wide range of industries including construction, oil drilling industry, power transmission,renewable energy sites and infrastrucyure works.
The solid one piece panels provide a firm working surface and can be used in any weather conditions. They are particularly suitable for use on transmission projects as they are non-conductive and also on romote or high theft risk sites due to their minimal scarp value.
The panels are rigid enough to efficiently disperse the heaviest of loads whilst at the same time they will follow ground contours allowing use on undulating ground.
Simple robust 16mm bolted connections allow the panels to be joined in their wide track layouts or compoound and work areas of any dimension. Easily installed with crane mounted wagons or all terrain forklifts/telehandler.
Heavy equipment mud mats / HDPE crawler ground road mats / Construction access mat and temporary roads mat
Specification of our heavy equipment mud mats / HDPE crawler ground road mats / Construction access mat and temporary roads mat:
Standard size: 4500*2000*38mm(plus two side 5mm traffic lugs) Total 48mm
3000*2500*38mm(plus one side 7mm traffic lugs, one side 2mm pedestrian) Total 47mm
The thickness can be various according customer required loading weight.
Packaging & Delivery:
Supply Ability |
5000 Ton/ Tons per year
|
Packaging & Delivery |
Packaging Details: pallet packaging and wooden box packaging Delivery Time: 15 DAYS Port: Qingdao Lead Time : 15 DAYS |