shanghai shenhu kc-4 cafe capsule packing machine
USD $11,000 - $12,650 /Set
Min.Order:1 Set
Shanghai Shenhu Packaging Machinery Equipment Co., Ltd.
shanghai shenhu top sale 1 head coco powder cups filling sealing machine
Professional Manufacturer Environmental Protection Empty K Cup
Ready to ship nespresso coffee capsule filling machine coffee capsule machine filling powder
Small rotary high accuracy Dolce Gusto nespresso coffee capsule filling sealing machine
Shanghai powder coffee sealing and packaging machinery coffee filling and sealing machine
Shanghai shenhu factory price cafe capsule packing machine
Introduction:
This machine( shanghai shenhu kc-4 cafe capsule packing machine
) is specially designed for coffee products (or other kinds of powder
products, such as tea powder, cocoa powder etc. ) to be filled and sealed.
This machine( shanghai shenhu kc-4 cafe capsule packing machine
) applied with world famous electricaland pneumatic components.
All the parts of machine contact with powder are made of stainless steel.
PLC touch screen control.
Parameters:
Prodcut Name | shanghai shenhu kc-4 cafe capsule packing machine |
Machine Model | KC-4 |
Filling Heads | 4 Heads |
Production Capacity | About 2500 cups/H for powder |
Filling Range | 0-15g (Can be adustable) |
Accurate | Less then 1% |
Power | 4Kw |
Air Consumption | 0.8M3/M |
Power Source | AC 220V/380V |
Temperature | 0-400 |
Weight | 750 kg |
Dimesion | 2800*700*1600mm |
Wooden Case | 2900*800*1750mm |
Working step:
Machine show ( shanghai shenhu kc-4 cafe capsule packing machine ):
sealing part
twice sealing device
filling parts
Working plate ( you can see the failing cup, failing filter and stract pre-cut film device from this picture)
Our parts list of shanghai shenhu kc-4 cafe capsule packing machine
No | Parts | Brand |
1 | Cylinder | AirTAC (Taiwan) |
2 | Solenoid valve | AirTAC (Taiwan) |
3 | Motor | Mitsubishi (Japan) |
4 | Proximity switch | Schneider (France) |
5 | Electronic switch | Schneider (France) |
6 | Encoder | Omron (Japan) |
7 | Slicer | Jinxiu (China Mainland) |
8 | PLC | Simens (Germany) |
9 | Touch screen | Simens (Germany) |
10 | Temperature controller | Omron(Japan) |
Machine Structure of shanghai shenhu kc-4 cafe capsule packing machine
1. Cup falling device 2. Hopper 3.Filling Device 4.Sucking Cover Device 5. Sealing 1
6. Sealing 2 7. Control Panel 8.Driving Device 9.Waste Exit 10. Supporting Foot
Samples of shanghai shenhu kc-4 cafe capsule packing machine
our machines usually packaging with standard export wooden box,.
Why choose us:
Our Partner
:
Our Marketing
Our certificate
our factory
We are here
Freely contact us:
Name:Peony Fan
Skype: live:juanzitangchao
Trademanage:cn1000399874
whats app:+86 13916368742
cell phone:+86 13916368742
Adress: A area No.1255,Xiangjiang Road, Nangxiang Town, Shanghai City, China
1. How About the Installation & Adjustment?
After the equipment arrived at the customer’s site, customers are responsible for unpacking and arranging the equipment in reference to the placement drawing or under our install-adjust technicians’ guidance. Costs of our staffs are decided at last.
2. Are There Training for Customers?
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
3. How about the "Quality Assurance"
We are responsible for the faults and damages of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc.The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.How about the Warranty?
We offer 12 months maintenance period to the problems that caused by our design, manufacture, and material quality, and offer the relevant parts and effective services for free if the problems was caused by above reasons. We will offer a life-long technical support, after service for customers.