Instant Noodle Pillow Packing Machine
Introduction
Instant noodle pillow packing machine is used for packing regular shape products, such as instant noodle, biscuit, wafer, moon cake, snow cake, cereal bars, bread, etc.
Certificate
CE CERTIFICATE, ISO CERTIFICATE provided.
Samples
Advantages
Dual frequency conversion, bag length of bread clip packing machine can be set and cut in one step, saving time and film.
Instant noodle pillow packing machine has reasonable construct, stable working performance, and PLC computer control, easy operation.
Self fault diagnosis, clear fault display.
High sensitivity photo cell color tracing, numerical input of cutting and sealing position for extra accuracy.
Positioned stop function, without sticking knife or wasting film is one feature of pillow packaging machine.
Fully automatic and continuous.
Various package sizes of can be made.
Various packing material can be used, like OPP, PE, PVC, OPP/CPP, KOP/CPP,ALU-FOIL, etc.
Technical Parameters
Model | LSU-220P | LSU-350P | LSU-420P | LSU-620P |
Film width | Max. 250mm | Max. 350mm | Max. 450mm | Max. 600mm |
Bag length | 65-190mm or 120-280mm | 65-190mm or 120-280mm | 120-450mm | 120-450mm |
Bag width | 30-110mm | 30-160mm | 50-160mm | 50-200mm |
Production height | 5-40mm | 5-40mm | 10-80mm | 10-80mm |
Film roll diameter | Max. 320mm | Max. 320mm | Max. 320mm | Max. 320mm |
Film thickness | 0.03-0.07mm | 0.03-0.07mm | 0.03-0.07mm | 0.03-0.07mm |
Packing speed | 40-230bag/min | 40-230bag/min | 20-80bag/min | 20-80bag/min |
Power | 220V, 50/60Hz, 3.4kw | 220V, 50/60Hz, 2.4kw | 220V, 50/60Hz, 4.2kw | 220V, 50/60Hz, 4.6kw |
Weight | 500kg | 600kg | 800kg | 900kg |
Dimension | 3770 x 640 x 1360mm | 4020 x 770 x 1450mm | 4380 x 870 x 1500mm | 4380 x 970 x 1500mm |
Key equipment show
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer
needed, we could make workshop design with electricity power, water supply, gas power,
material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country
immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start
for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize
normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean,
maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee
from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.
Delivery