Injection Molding Pet Chews Machine/nutual Dog Food Pet Food Pellet Making Machine/popular Dog Treats Machine
USD $10,000 - $50,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Introduction
Pet Chews Injection Molding Machine is special machinery for producing pet snacks. With such machine, various shapes can be made, such as hedgehog, crocodile, dog, bone, pork ears, barrel, etc. The shapes are very lovely and it is a ideal encouragement to dogs and cats while they learn a new action or do well in some exercises and games. Also, we can provide different recipes to meet various market demands.
CE Certificate
CE CERTIFICATE provided, which strictly meet CE standards and EU countries import policy.
ISO 9001 CERTIFICATE provided, which strictly meet ISO 9001 standards.
Features
1). Moulding Machine comes with user-friendly microprocessor controller with these following features;
2). Dust, oil proof and colorful touch switch control panel.
3). El display of pressure, speed, time and distance for each motion.
4). Shut-down device with 100 presets mold data memory.
5). Equipped with 4 stages injection, 3 stages holding pressure and 3 stages back pressure.
6). PID barrel temperature control: temperature abnormal & electrical wire disconnection alarm.
7). SSR-solid state temperature controller.
8). Screw cold start protection.
9). Abnormal shot detection.
10). Output quantity and packaging quantity preset.
11). Clamping, injection and ejection (option), and carriage action (option) by linear potentiometer.
12). Screw rotating speed read-out.
13). Security code function to avoid missing data or careless changing.
14). Super low pressure clamping ensures security of user, and maintains lifespan of machine efficiently.
Technical Parameters
Model | DM-268 |
Clamping force | 5680KN |
Installed power | 89kw |
Max mold size | 800*800 |
Shot weight | 2500g |
Dimension | 8.9*2.3*2.8m |
Oil tank capacity | 1000L |
Commissioning & After-sales Service
1.We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2.After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6.The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.