sealing machine bag sealing plastic hand impuse sealer machine
USD $10 - $20 /Set
Min.Order:100 Sets
Shanghai Joygoal Food Machinery Co., Ltd.
sealing machine bag sealing plastic hand impuse sealer machine
Plastic film sealing machine
GT series hand pressure type film sealing machine is easy to operate, the heating time adjustable and it starts working just by turning on the power supply.Apply to all kinds of plastic film, composite membrane and aluminum-plastic film sealing;Can be widely used in food, local products, candy, tea, medicine, hardware and other industries, is the shop, family, factory, easy to use, the most economical sealing equipment.
Technical Parameters
Model | GT-100S | GT-200S | GT-300S | GT-400S |
Power source(V/Hz) | AC 200/50 110/60 | |||
Sealing Length(mm) | 180 | 260 | 430 | 600 |
Sealing width(mm) | 100 | 200 | 300 | 400 |
Max.seal Thickness(mm) | 2 | 2 | 3 | 3 |
Heat Time(s) | 0.2 | 0.2 | 0.3 | 0.3 |
Size(mm) | 230*72*170 | 325*75*225 | 440*83*255 | 540*85*280 |
Weight(kg) | 1.4 | 2.1 | 3.7 | 4.4 |
Features
1)clean and bright pattern.
2)colour selectable.
3)instant printing and instant dry.
4)convenient to change the characters.
24 hours online service
Enquiry will be replied in 2 hours
One year warranty
1%-2%Spare Parts
Free parts for any breakdown with convincing evidence
Shanghai Joygoal Food Machinery Co.,Ltd is a company integrating scientific research, manufacturing and service and specializing in manufacturing coffee capsule filling sealing machine, pouch filling capping machine, cup filling sealing machine. The product are sold well at home and abroad.
Q1:Are you factory or trading company?
A: We are factory and manufacture.
Q2: Where is your factory located? How can I visit your factory?
A: We are located in Shanghai, you can fly to Shanghai Hongqiao airport or Pudong airport. Wecan pick you up from the airport or your hotel.
Welcome to visit us!
Q3:How to place my order?
A: Just contact us via TraderManager, E-mail, Skype or telephone to confirm the product, make the deposit then we will start to manufacture.
Q4:What is the payment term?
A: 30% T/T deposit and 70% T/T balance payment before shipping.
Q5:How long is the delivery time?
A: About 35- 40 working days.