Hot selling shanghai Joygoal automatic liquid packing machine vertical filling and sealing machine
USD $2,200 - $2,200 /Set
Min.Order:1 Set
Shanghai Joygoal Food Machinery Co., Ltd.
Description:
milk filling sealing machine
This machine is high precision and most advanced liquid packing machine in China,which is three sides sealing, intermittent and vertical.
Features:
1. Automatically finish the processes of pouch forming, filling, sealing, cutting, date printing for pillow pouch packaging.
2. Two types suit for single layer PE film and laminated films.
3. PLC controller and A Pattern calibration photoelectric controller device, ensure the patterns will be complete and beautiful.
4. Quantitative piston pump filling ensure packaging volume can be adjusted within accurate range.
Techinal Paramet
Model | YT-1000B |
Packing speed | 1100-1300 pouches/hour |
Filling volume | 200-1000ml |
Power | 220V/380V 2.6KW |
Film width | 150-380mm |
Weight | 380kg |
Size | 1050*850*2050mm |
The sample of products:
24 hours online service
Enquiry will be replied in 2 hours
One year warranty
1%-2%Spare Parts
Free parts for any breakdown with convincing evidence
Shanghai Joygoal Food Machinery Co.,Ltd is a company integrating scientific research, manufacturing and service and specializing in manufacturing coffee capsule filling sealing machine, pouch filling capping machine, cup filling sealing machine. The product are sold well at home and abroad.
Q1:Are you factory or trading company?
A: We are factory and manufacture.
Q2: Where is your factory located? How can I visit your factory?
A: We are located in Shanghai, you can fly to Shanghai Hongqiao airport or Pudong airport. Wecan pick you up from the airport or your hotel.
Welcome to visit us!
Q3:How to place my order?
A: Just contact us via TraderManager, E-mail, Skype or telephone to confirm the product, make the deposit then we will start to manufacture.
Q4 : What is the payment term?
A: 30% T/T deposit and 70% T/T balance payment before shipping.
Q5:How long is the delivery time?
A: About 35- 40 working days.