high pressure BS5163 ductile iron ggg50 12 inch resilient seated gate valve PN16
USD $600 - $800 /Ton
Min.Order:1 Ton
ductile cast iron ggg50 water seal rising stem gate valve dn100
China ductile iron AWWA C509 NRS Non Rising Stem Resilient Seated Gate Valve
ductile cast iron foot operated valve with stainless steel strainer
ductile cast iron DIN3202-F6 dn50 PN16 swing type flap check valve price
DIN Standard DIN3202-F1 Ductile Cast Iron Water Y Strainer PN16
high pressure BS5163 ductile iron ggg50 12 inch resilient seated gate valve PN16
1 |
Standard |
BS |
|
2 |
Type |
Cuniform |
|
3 |
Size |
DN50~DN400mm |
|
4 |
Nominal Pressure |
1.6MPa |
|
5 |
Test Pressure |
Strength(water ) |
2.4MPa |
Enclose(water) |
1.76MPa |
||
6 |
Suitable Temperature(℃) |
≤425℃ |
|
7 |
Medium |
Water, oil, vapour, etc |
Parts Name |
Material |
Valve Body, Bonnet |
Steel |
Wedge |
Steel |
Stem |
Steel |
Yoke nut |
Ductile Iron |
1. How is your price?
A: Although we have brand-name products, our prices are very favorable and competitive.Because of our best price, customers from all over the world come to purchase our products.
2. How long is your warranty?
A: Our Warranty is 12 month.
3. Can I get free samples?
A: Yes, we can provide you the free samples, but you need to bear their own delivery costs.
4. Can I request to change the form of packaging and transportation?
A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.
5. Can I request to advance the shipment?
A: It should be depends on whether there is sufficient inventory in our warehouse.
6. Could you specially design and produce for clients?
A: Sure, we have all kinds of professional engineers.We can design and produce special products according to customers' request. Such as: special size, special control, OEM, etc.
7. What’s the MIDAS main market?
A: Our main market is African, Middle East Countries, South American, Asian.
8. What’s your payment?
1) 100% T/T
2) 30% in advance, others before shipment.