Pallet Truck Power Units Pack Hydraulic
Pallet Truck Power Units Pack Hydraulic
Pallet Truck Power Units Pack Hydraulic
Pallet Truck Power Units Pack Hydraulic
Pallet Truck Power Units Pack Hydraulic
Pallet Truck Power Units Pack Hydraulic

Pallet Truck Power Units Pack Hydraulic

USD $150 - $300 /Piece

Min.Order:1 Piece

Supply Ability:
200000 Piece / Pieces per Month
Port:
Shanghai
Payment Terms:
T/T Credit Card

Quick Details View All >

Brand Name:
Jinle
Place of Origin:
China

Wuxi Jinle Automobile Motor Factory

Business Type: Agent
Main Products: Hydraulic dc motors ,hydraulic power unit ,switch solenoid ,Drive wheel for electric forklift

Product Details

Pallet Truck Power Units Pack Hydraulic

Pallet Truck Power Units Pack Hydraulic

Product Description
 

General Description
Consisting of high pressure gear pump, DC motor, multifunctional manifold, valve, tank, etc. This power unit can be widely used in the industry logistic devices such as minifork lift. The lowering movement is controlled by the solenoid valve with the sped controlled by the balance valve.

Model Specifications 

Model

Motor Info

Pump Displacement

Tank Capacity

Pressure

Mounting

Oil Port

L(mm)

HPU-10ABBCAHAEAA

12V 0.8KW 3650RPM

0.5cc/r

1.0L

16MPa

 

 

 

Horizontal

 

 

1/4*BSPP

 

178

HPU-10ABBDAHAEBA

12V 0.8KW 3650RPM

0.75cc/r

1.2L

210

HPU-10BBBCBHAEAA

24V 0.8KW 3650RPM

0.5cc/r

       1.0L

178

HPU-10BBBDBHAECA

24V 0.8KW 3650RPM

0.75cc/r

1.7L

170

 Remark:
1.The manual override function, the different pump displacement, motor power, tank capacity are available on request.

 

Special notes

1. The duty of this power unit is S3. ie: 30 seconds on and 270s off.

2. Clean all the hydraulic parts concemed before mounting the power unit.

3. Viscosity of the hydraulic oil should be 15-68 cst, which should also be clean and free of ompurities. N46 hydraulic oil is recommended.

4. This power unit should be mounted horizontal.

5. Check the oil level in the tank after the first start of the power unit.

6. Oil changing is required after the initial 100 operation hours afterwards once every 3000 hours.

Pallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack Hydraulic

 Pallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack HydraulicPallet Truck Power Units Pack Hydraulic
FAQ

1. Business Type

a. Manufacturer located in Wuxi City, Jiangsu Province
b. Factory cover an area of 6000 square meterselectric forklift motor 
c. Employees: over 70 in office & workshops 

 

2. Certificates

CE, ISO9001 etc

 

3. How long could we get the goods?

a. 10-20days for mass production based on your quantity 
b. 5~10days for Sampe orders 

 

4. Quality Control

a. 100% inspection before packing electric forklift motor 
b. Spot inspection before shipment 

 Pallet Truck Power Units Pack Hydraulic

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Motor > DC Motor
Categories
Hi~