Motor Starter Control Transformer , Custom-made Design
Negotiable /Piece
Min.Order:100 Pieces
Product Description
Input Voltage: AC 100V/110V/115V/120V/220V/230V/240V;50/60Hz to be customized
Output Power: 1.0VA -500VA to be customized
Products Advantages:
1.Low no-load loss
2.High Reliability
3.High Transmission Efficiency
4.Low-temperature Rise
5.Excellent Safety
6.UL Approved.
7.High output power
8.Rohs fully compliance
9.It can be customized according to the requirements of customers and provide total design solutions to customer
Application:
1.Industrial application
2.Household Appliance.
3.New Energy
4.Communications
5.Other Industrial application
Testing Items:
No-load Test(No-load Current, No-load Voltage, No-load Loss)
Load Test (Load Voltage, Temperature-rise)
Inductive Voltage Test, DC Resistance Test, Safety Test
Operating environment:
1) Temp.: The ambient temperature can not over +40°C.
2) Altitude: Mounting location can not exceed the altitude of 2000m
3) Relative humidity: Maximum 90%
4) The site not attack by rain and snow
5) The medium which no explosion danger, no corroding metal, no electrical breakdown
Our Advantages:
1. 27 years experience in transformer and inductor manufacturing;
2. Scientific management system, strong technical team, and strict quality control system;
3. RoHS,CE,TUV and UL certified;
4. OEM & ODM;
5. Competitive price,in time delivery and perfect after-service online.
AL TRANSFO could design and produce according to customer's requirements !
Packaging & Shipping
Our Services
1. Sample order is welcome.
2 . Fasted delivery to meet customers' need.
3. Customized packing and customer's LOGO (OEM service) are accepted
4. Various transport ways : by sea, by air & freight company(DHL,FEDEX,UPS,TNT,EMS...)
5. Your inquiry will be replied within 24 hours.
6..Our products will be 100% test before shipping by our workers and QC
7. Good after-sale service offered, please send us feedbacks if you have any question.
8.We provide one-stop service.
FAQ
1. Question: Lead time for samples?
Reply: 3-5 working days.
2. Question: Lead time for mass production?
Reply: 7 to 15 working days or depending on order quantity.
3. Question: What should provide to make custom transformer ?
Reply: Supply drawing is best, or tells us the size, inductance, resistance and etc.
4 . Question : What is payment term ?
Reply : T/T , Western Union , PayPal or negotiation.