ASTM Stainless Steel 90 Degree Wall Mount Handrail Bracket For Stair Handrails
USD $0.5 - $2 /Piece
Min.Order:1000 Pieces
Foshan Shunde Pemco Hardware Co., Ltd.
Brand | PEMCO |
Material | SS 201, 304 |
Finish | Stain/Polish |
Package | Individually in plastic bag, standard carton for outer packing |
Certificate | ISO 9001-2000 |
Usage | (1) For construction and handrail use. |
(2) In shopping mall, house. | |
Feature | Made of stainless steel, beautiful outlook, easy to clean, with low |
maintenance cost. | |
Application | Decoration, widely used on stainless steel balustrade & handrails, |
indoor or outdoor decorations,etc. | |
Delivery Time | 15-20 days |
MOQ | 500 pieces |
ASTM Stainless Steel 90 Degree Wall Mount Handrail Bracket For Stair Handrails
1.We have engaged in this area for more than 10 years;
2.It sells well both at home and abroad and enjoys a good fame;
3.Our plant works with everything from the raw material to the finished product;
4.We produce customerized models accessories to suit the need of the global market;
5.The production cycle is greatly shortened owing to powerful productivity.
PEMCO HARDWARE CO., LTD
Q1.Where is your factory?
We have two factories. One is for ss pipes in Foshan City,another is for handrail fittings in Chaozhou City.
Q2.What material do you have? SS304/SS201/SS316
Q3.Can you provide sample for us? Yes, free sample is available
Q4. How do you ensure quality control?
we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.
Q5.How do you ship the goods to us?
We have the forwarder cooperated with us for 11 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.
Q6.Which country is your main market now?
Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.
Q7. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.
Q8. How about your delivery time ?
15-20 days for Pipe. 25-30 days for handrail fittings .
Q9.how about your payment terms?
T/T,L/C,D/P.
Q10.What's the package for the fittings?
1PC/PP BAG .50PCS/ HARD CTN.