China Big Factory Good Price rigid electrical conduit
USD $0.2 - $1 /Piece
Min.Order:1 Piece
Weifang East Steel Pipe Co., Ltd.
Application | protect and route cables and conductors |
Thickness | 1.3mm---1.8mm of Bs4568 class 4 gi cable pipe |
Standard | ul6 |
surface preparation | galvanized |
Product Keywords | rigid steel conduit,electrical conduit,conduit imc |
Product Information | |||||
Brand : | east conduit | ||||
Standard: | UL6 & ANSI C80.1; File No.:E308290; | ||||
Trade Size : | from 1/2" to 6"; | ||||
Both Ends: | threaded both ends with one coupling and plastic cap; | ||||
Length: | 3050mm or according to customer's requirement; | ||||
Usage: | through the electrical wires with the purpose of protection for the electrical raceway system; | ||||
Surface Finished: | Hot dip galvanized(HDG); | ||||
Material : | carbon steel coil; | ||||
Package: | the conduits coverd with pvc paper then tied with steel straps; | ||||
Delivery Time: | 20 to 30 days after we receive your advance payment or copy of L/C; | ||||
Payment Term: | L/C at sight or T/T; |
Dimension and Weight Chart
Trade Size | Nominal Wt. per 100Ft(30.5M) | Nominal Outside Diameter | Nominal Wall Thickness | ||||
U.S. | Metric | Lbs | Kg | In. | mm | In. | mm |
1/2" | 16 | 82 | 37.2 | 0.84 | 21.3 | 0.104 | 2.6 |
3/4" | 21 | 109 | 49.44 | 1.05 | 26.7 | 0.107 | 2.7 |
1" | 27 | 161 | 73.03 | 1.315 | 33.4 | 0.126 | 3.2 |
1-1/4" | 35 | 218 | 98.88 | 1.66 | 42.2 | 0.133 | 3.4 |
1-1/2" | 41 | 263 | 119.3 | 1.9 | 48.3 | 0.138 | 3.5 |
2" | 53 | 350 | 158.76 | 2.375 | 60.3 | 0.146 | 3.7 |
2-1/2" | 63 | 559 | 253.56 | 2.875 | 73 | 0.193 | 4.9 |
3" | 78 | 727 | 329.77 | 3.5 | 88.9 | 0.205 | 5.2 |
3-1/2" | 91 | 880 | 399.17 | 4 | 101.6 | 0.215 | 5.5 |
4" | 103 | 1030 | 467.21 | 4.5 | 114.3 | 0.225 | 5.7 |
5" | 129 | 1400 | 635.04 | 5.563 | 141.3 | 0.245 | 6.2 |
6" | 155 | 1840 | 834.62 | 6.625 | 168.3 | 0.266 | 6.8 |
Applicable tolerances:
Length: 10Ft (3.05m) ± ¼" (±6.35mm).
Outside Diameter: ½"-2" ±0.015" (±0.38mm); 2½"-4" ±0.025" (±0.64mm); 5"-6" ± 1%
Standard export carton packing.
35-40 days after confirming order,detail delivery date should be decided according to