M6 M8 M10 carbon steel stainless steel alloy materials wing bolts and nuts
USD $0.02 - $0.02 /Piece
Min.Order:1000 Pieces
Shanghai Beall Metal Co., Limited
trapezoidal Fasteners threaded rod nuts High Quality bolts and nuts
stainless steel fasteners threaded rod SUS2507 Thread Rod 1meter studs bolt
DIN933 AND DIN934 alloy steel bolts monel 400 blind bolts stainless steel
din985 nylock lock nut with nylon insert zinc m4 hex flange nylon lock nut
high quality hex nylon nut Stainless steel DIN985 nylon insert lock nuts
Product Name | M6 M8 M10 carbon steel stainless steel alloy materials wing bolts and nuts |
Size | M4-M24 |
Grade | 4.6,4.8,5.6,6.8,8.8,9.8,10.9,etc |
Standard | ISO 4017, DIN931, GB5783, DIN, ASTM, ANSI, JIS, EN, AS |
DIN Standard | DIN933 DIN931 DIN934 DIN912 DIN603 DIN6923 |
Available Material | 18-8 Stainless Steel, stainless steel ss 304/ SS316 A2/A4, SS201, SS303, SS304, SS316, SS316L, SS904L, A2-70; A4-70; A4-80 |
Head Type | Hex, Square, Round, Hex flange, Flat, T-head & Triangular etc |
Neck Type | Hex, Square, Triangular, Oval & Knurled etc |
Drive Type | Phil, Slotted, Hex socket, Torx & square slot etc |
Surface treatment | Nature color,Black oxide,Phosphate,Zinc plated,Dacroment,etc |
Manufacturing Process | Wire Drawing, Cold Heading, Insert tapping, Heat Treatment, Surface Plating, Inspection, Packing |
Certificate | ISO9001:2008,ISO14001:2004 |
Advantages | OEM / ODM / customized service provided |
Delivery time | Regular product is about 7-15 days, custom product will according to special requirement |
Application | Wind tower, Nuclear power, Railway, Automotive industry, Construction, Electronic industry |
Packing Details : Packing, solid bicycle saddle, 50pcs/carton
Delivery Details : 3-30 days after order of Solid bicycle tire tubes
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: