SCH5 SCH10 SCH20 SCH40 SCH80 SCH160 SCH XXS Stainless Steel Seamless Tube/Pipe 304 304L 304H 309 310S 316 316Ti 321 347 Factory
USD $2,800 - $3,200 /Ton
Min.Order:1 Ton
Shanghai Beall Metal Co., Limited
SCH5 SCH10 SCH20 SCH40 SCH80 SCH160 SCH XXS Stainless Steel Seamless Tube/Pipe 304 304L 304H 309 310S 316 316Ti 321 347 Factory
Product | Stainless Steel Pipe and Tube |
Outside Diameter | 1-1500mm |
Thickness | 0.1-150mm/SCH5-SCH160-SCHXXS |
Production Process | Cold Drawn,Cold Rolled,Bright Anneal etc |
Application | 1).Heat exahanger tube for petrochemical,chemical and ocean development 2).Industrial furnace and heater tubes 3).for gas turbine and prochemical processing4).Condenser tubes,sulfuric and phosphoric acids tubes,API tubing 5).Construction and ornament 6).Acid production,waste incineration,FGD,paper processing industrial e |
Price Item | EXW,FOB,CNF,CIF etc |
Surface | Pickling,Bright etc |
Type | Seamless,welded |
Material | 200 series: 201,202,202Cu,204Cu, 300 series: 301,303/Cu,304/L/H,304Cu,305,309/S,310/S,316/L/H/Ti,321/H,347/H,330, 400 series: 409/L,410,416/F,420/F,430,431,440C,441,444,446, 600 series: 13-8ph,15-5ph,17-4ph,17-7ph(630,631),660A/B/C/D, Duplex: 2205(UNS S31803/S32205),2507(UNS S32750),UNS S32760,2304,LDX2101.LDX2404,LDX4404,904L Alloy : Alloy 20/28/31; Hastelloy: Hastelloy B / B-2/B-3/C22/C-4/S/ C276/C-2000/G-35/G-30/X/N; Haynes: Haynes 230/556/188; Inconel: Inconel 100/600/601/602CA/617/625713/718738/X-750,Carpenter 20; Incoloy: Incoloy 800/800H/800HT/825/925/926; GH: GH2132,GH3030,GH3039,GH3128,GH4180,GH3044 Monel: Monel 400/K500 Nitronic: Nitronic 40/50/60; Nimonic: Nimonic 75/80A/90 ; Others: 153Ma,254SMo,253Ma,654SMo,F15,Invar36,1J22,N4,N6 etc 1.4057,1.4313,1.4362,1.4372,1.4378,1.4418,1.4482,1.4597,1.4615,1.4662,1.4669, 1.4913,1.4923 etc |
Packing: 1.wooden box
2.bundle package
Delivery time: 15-25 days,depend on the actual quantity and stock situation.
Beall promise best quality,competitive price and professional service.
1.Free sample is available.
2.Mill Test Certificate is supplied with shipment.
3.The third party inspection is accepted.
A: We are manufacturer
A: Generally it is 7-10 days if products are in stock. or about 25 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.