Germany Deutstandard Egg Bread cake maker korean snack gyeran-ppang recipe baking machine for sale
USD $229 - $239 /Set
Min.Order:1 Set
Guangzhou New Power Catering Equipment Manufacturing Co., Lt
egg waffle machine | ||
model: | NP-220 | |
material: | stainless steel 201 | |
dimensions: | 650*450*260mm | |
packing size: | 650*400*340mm | |
net weight: | 21kg | |
gross weight: | 24kg | |
volts: | 220v/110v50Hz | |
power: | 3.2kw |
1. Japan's non-stick coating, high-definition mold, produced perfect, double-sided flip design, easy to operate, easy to contact even the batter inside the wall, uniform coloring, the product to achieve the perfect baking effect.
2. Japan's Song Ling precise timing controller, controlled by the circuit, the time 0-10 minutes adjustable,set the baking time, each time just press the control switch can be, the time is accurate Stable (other manufacturers do not have a timer, to their own plus a timer) at the same time have more time to operate other things, you can take full advantage of time and improve efficiency.
3. Adjustable temperature control, you can set a different temperature, so that the product to achieve the perfect baking effect.
4. The company's patented design of the front and rear fixed bracket, solid and stable, easy to flip (other companies only use a piece of metal support, a long time is easy to fall off).
5. One time 3-5 minutes to do 4pcs, yield, simple operation, simple raw materials, make money fast, it is the current popular snack business projects.
1.What is your Minimum Order Quantity (MOQ)?
We are a manufacturer MOQ usually is 1 unit.
We welcome Wholesale and distribution customization.
2.What Methods of Payment Are Acceptable?
Telegraphic Transfer (T/T) we accept 30% T/T deposit before production and 70% T/T Balance before shipment.
100% payment for sample orders.Western Union. We accept 100%payment via the western union.
3.What are the Costs of Shipping?
Shipping cost is based on the following elements.
Number of packages
Gross Weight
Package volume
Destination port
4.How About the Delivery Time?
Some of the products are in stock at our warehouse, generally we need 3-5days to change the plugs before the delivery. Regarding to the non-stick products, the lead time_35days depends on your requirement on the product.
Send us an inquiry and we will contact you soon!