High Brightness RGBWhite RGBW RGB White 5050 Led Strip
USD $3 - $4.5 /Meter
Min.Order:10 Meters
Shenzhen Shinelight Technology Co., Ltd.
High Brightness RGBWhite RGBW RGB White 5050 Led Strip
Brief Details:
Part No.: GL-R1000TF-60×50-RGBW 5050 60leds/meter 4 in 1 RGBW LED Strip
| |||
Working Voltage | DC12V/24V | Lm/LED | 18-20lm |
LED | SMD5050 | Beam Angle | 120° |
PCB Width | 12mm | Watts/M | 19.2W |
LEDQty/M | 60 leds | MOQ | 10 Meter |
Warranty | 3 Years | Certificate | CE, ROHS |
4.Waterproof Material: Silicone hollow tube ,Silicone glue and Silicone transparent waterproof connector.
5.3 years warranty
Indoor and outdoor decoration lighting, Back lighting, Holiday decoration, Signs, LED screen, Furniture lighting, KTV, Bar, etc..
3. Sample policy : Samples are always availble for each model . Samples can be ready in 3~7 days once
payment received .
4. Shipping port: Shenzhen,China
Our Service:
1.Many solution for you,Chips,Power supply,Customize your product,So easy!
2.Fast responce to your inquiry and feedback.
3.Good quality material makes good quality led strip light.
4.Strict quality controller system and testing before shipment.
5.After-sale sevice
1)If driver failed,we’ll send you the new driver
2)if the LED failed,we’ll send you the new LED.
3Unclear reason,pls send us the pictures or original product,we will provide you the solution after we check.
All freight at our side,Professional after-sale team work for you!
Factory:
FAQ:
Q1: Can I have sample(s) to test?
A: Yes,we are pleased to supply samples to test and check quality,mixed sample order is available. free samples is also acceptable.
Q2: Do you accept which payment methods ?
A: we accept TT, Paypal and Western Union, Escrow all is ok.
Q3: What’s the lead time?
A: Sample :1-3working days.Mass production: 5-15working days depend on the order quantity
Q4: Do you have any MOQ limited?
A: There is no MOQ limited for first order.
Q5:How do you ship the goods and how long does it take?
A: We usually ship by DHL,UPS,FEDEX,TNT. It usually takes 3-5working days to arrive. By air,by sea are also acceptable.