High lumen 120leds per meter double row 5630 dc24v samsung led strip light
USD $2.5 - $5.5 /Meter
Min.Order:1 Meter
Shenzhen Shinelight Technology Co., Ltd.
High lumen 120leds per meter double row 5630 dc24v samsung led strip light
Details:
Part No.: GL-R1000TF-1200×56 5630 doube row 120leds/meter
| |||
Working Voltage | DC24V | Lm/LED | 50-55lm |
LED | Samsung SMD5630 | Beam Angle | 120° |
PCB Width | 15mm | Watts/M | 28.8W |
LEDQty/M | 120 leds | MOQ | 5 Meter |
Warranty | 3 Years | Certificate | CE, RHOS |
Features:
1.Flexible copper pcb material
2.Double side PCB, with 3M tape on the back
3. 3 years warranty, use samsung led
4.Emitting Color: Red / Green / Blue / Warm white / Neutral whtie / Cool white
5.Standard length is 5m/reel with 10-15cm electric cable wire.
6.Length customization to specific project
7.Bend Vertically for various applications
8.Working Voltage: DC 12V (DC 24V is available).
9. Luminous Flux: 30-35 Lumens/LED, 50-55lm/led (High lumen).
Product Show:
IP20 Nonwaterproof type
Waterproof Detail
Application:
Indoor and outdoor decoration lighting, Back lighting, Holiday decoration, Signs, LED screen, Furniture lighting, KTV, Bar, etc..
Advantage of led light:
1.Easy installation
LED tape lights are easy to install, even for the nonprofessional.
All you need to affix tape light to a surface is its "peel-and-stick" adhesive backing.
Tape light makes DIY installation of under cabinet and cove lighting, accent lighting, and mood lighting a cinch!
2.Safe Indoors & Outdoors
LED tape light is safe for installation indoors and outdoors.
12 volt (coming soon) and 24 volt tape light options minimize the risk of electrical shorts and safety hazards frequently encountered with line voltage outdoor lighting.
You can install it under eaves, on gazebos and decks, and even lining sidewalks.
3.Versatile & Energy Saving
Our standard output LED tape light consumes fewer than 2 watts per foot and is ideal for most accent lighting applications. Our high output tape light uses less than 5 watts per footand is 3 times brighter than the standard version, making it great for outdoor areas and indoor task lighting.
Diagram
Packing detail
N.W | 0.17kg / Roll |
G.W | 7.6kg / carton |
Inner pakcing | 5 meter / Roll |
Master carton | 50 Roll / carton |
Size&Weight: | 52*24.5*27CM |
Shipping:
1. Payment term: T/T 30% deposit after order confirmed, the balance after goods ready before shipping .
or paypal, Western Union for small amount .
2. Lead time : normally in 5~10 days after deposit received .
3. Sample policy : Samples are always availble for each model . Samples can be ready in 3~7 days once
payment received .
4. Shipping port: Shenzhen,China
Grilight Hot Sale:
Prompt delivery & professional after-sales service are our priority, which makes us to be your reliable partner.
Trade terms
1.) Payment Terms: T/T,Western Union,paypal.
2.) Delivery ways: DHL,EMS,UPS,FedEx door to door service, by sea, air and etc.
3.) MOQ: No MOQ for the first order.
4.) Sample fee: sample for FREE
Why choose us
1.) Your inquiry related to our products or prices will be replied in 24hours.
2.) Well-trained and experienced staffs to answer all your inquires in fluent English
3.) OEM and ODM,any your customized lightings we can help you design put into product
4.) Distributonership are offered for your unique design and some our current models
5.) Protection of your sales area,ideas of design and all your private information
6.) Have the perfect after-sales service for all our clients
A: Yes,we are pleased to supply samples to test and check quality,mixed sample order is available. free samples is also acceptable.
Q2: Do you accept which payment methods ?
A: we accept TT, Paypal and Western Union, Escrow all is ok.
Q3: What’s the lead time?
A: Sample :1-3working days.Mass production: 5-15working days depend on the order quantity
Q4: Do you have any MOQ limited?
A: Our MOQ EXW is 1000pcs to supply new customers.
Q5:How do you ship the goods and how long does it take?
A: We usually ship by DHL,UPS,FEDEX,TNT. It usually takes 3-5working days to arrive. By air,by sea are also acceptable.