Russian standard AC 70-11 GOST 839-80 bare Aluminum conductor steel wire core cable price
USD $1 - $99 /Meter
Min.Order:200 Meters
Mongolia best selling AC 150/24 aluminum conductor steel wire core factory price
Overhead Power Transmission Line All Aluminum Conductor 50mm Aluminum AAC Bare Conductor Cable
Huadong Bare wire cable manufacturers aaac conductor wire from China
Huadong AAC 500 MCM stranding conductor electrical wires used all aluminum material
Huadong MV ABC Cable Aluminium 11kv Price List of Aerial Bundled Cable ABC Concentric Cable
ACSR conductors are being used on transmission line networks for all climatic regions as per GOST 15150. The conductors are being manufactured as per GOST 839-80 requirements. ACSR is consisting of steel and aluminum wires. The installation of the conductor has to be done as per PUE requirements. Maximum continous permissible temperature of the conductor should not exceed 90 C.
# | Section | Aluminum part | Steel part | Min. Breaking Strength | ||
---|---|---|---|---|---|---|
Number of wires | Nom. wire diameter | Number of wires | Nom. wire diameter | |||
1 | 16/2.7 | 6 | 1.85 mm. | 1 | 1.85 mm. | 6,220 N. |
2 | 25/4.2 | 6 | 2.30 mm. | 1 | 2.30 mm. | 9,296 N. |
3 | 35/6.2 | 6 | 2.80 mm. | 1 | 2.80 mm. | 13,524 N. |
4 | 50/8.0 | 6 | 3.20 mm. | 1 | 3.20 mm. | 17,112 N. |
5 | 70/11 | 6 | 3.80 mm. | 1 | 3.80 mm. | 24,130 N. |
6 | 70/72 | 18 | 2,20 mm. | 19 | 2.20 mm. | 96,862 N. |
7 | 95/16 | 6 | 4.50 mm. | 1 | 4.50 mm. | 33,369 N. |
8 | 120/19 | 26 | 2.40 mm. | 7 | 1.85 mm. | 41,521 N. |
9 | 120/27 | 30 | 2.20 mm. | 7 | 2.20 mm. | 49,465 N. |
10 | 150/19 | 24 | 2.80 mm. | 7 | 1.85 mm. | 46,307 N. |
11 | 150/24 | 26 | 2.70 mm. | 7 | 2.10 mm. | 52,279 N. |
12 | 150/34 | 30 | 2.50 mm. | 7 | 2.50 mm. | 62,643 N. |
13 | 185/24 | 24 | 3.15 mm. | 7 | 2.10 mm. | 58,075 N. |
14 | 185/29 | 26 | 2.98 mm. | 7 | 2.30 mm. | 62,055 N. |
15 | 185/43 | 30 | 2.80 mm. | 7 | 2.80 mm. | 77,767 N. |
16 | 205/27.0 | 24 | 3.30 mm. | 7 | 2.20 mm. | 63,740 N. |
17 | 240/32 | 24 | 3.60 mm. | 7 | 2.40 mm. | 75,050 N. |
18 | 240/39 | 26 | 3.40 mm. | 7 | 2.65 mm. | 80,895 N. |
19 | 240/56 | 30 | 3.20 mm. | 7 | 3.20 mm. | 98,253 N. |
20 | 300/39 | 24 | 4.00 mm. | 7 | 2.65 mm. | 90,574 N. |
21 | 300/48 | 26 | 3.80 mm. | 7 | 2.95 mm. | 100,623 N. |
22 | 300/204 | 54 | 2.65 mm. | 37 | 2.65 mm. | 284,579 N. |
23 | 330/43.0 | 54 | 2.80 mm. | 7 | 2.80 mm. | 103,784 N. |
24 | 400/18 | 42 | 3.40 mm. | 7 | 1.85 mm. | 85,600 N. |
25 | 400/51 | 54 | 3.05 mm. | 7 | 3.05 mm. | 120,481 N. |
26 | 400/64 | 26 | 4.34 mm. | 7 | 3.40 mm. | 129,183 N. |
27 | 400/93 | 30 | 4.15 mm. | 19 | 2.50 mm. | 173,715 N. |
28 | 500/27 | 76 | 2.84 mm. | 7 | 2.20 mm. | 112,188 N. |
29 | 500/64 | 54 | 3.40 mm. | 7 | 3.40 mm. | 148,257 N. |
30 | 600/72 | 54 | 3.70 mm. | 19 | 2.20 mm. | 183,835 N. |
Within 15 days
1) Packing length:100 to 1,000m reeled in carton drum or according to customers' requirement
2) Outer packing: wooden case, carton box
3) Other packing requirement according to client's request
1. We guarantee to offer new advanced goods.
2. We'd like to send skilled personnel to the installing place to help offer technical consultant, quantity estimation and instruction, installing, preliminary testing,and help start up running; and to answer for any defect of the product found in installing and run testing, If there's something wrong with the product, we'll give our answer within 12 hours and get to the spot within 36 hours.
3.After installaton, We'll send skilled personnel to have the preliminary test and answer for any problems emerged. We take the whole charge of the fee needed in repairing,testing or retesting within the scope of our duty required in contract.
4.During the contract's period of validity,of the project must be started all over again or the goods can not be used at all which is resulted from our faulty goods and improper files or mistakes made by our instructors, we'll change the goods at once without compensation and take charge in all expenses of reinstallation.
Henan Huadong Cable Co., Ltd is a joint stock enterprise integrated incable production, research & development,
and domestic& international trade.
Established year: 1988
Total asset: USD 400 million
Plant area: 30000 m2
Number of staff: 380
Engineer:20
Laboratory Inspector: 18
Production line: 18
Testing machine:25
Producing capacity each year: 320000 km.
acsr Standard:
Our products are produced according to the standards of GB, IEC, BS, DIN, ASTM, JIS, NF, AS/NZS, CSA and so on.Meanwhile we can produce based on customers' requirements and specifications.
acsr Certificate:
The company has passed ISO90012008 quality certification, CCC China Compulsory Certification, National ElectricalProduct Safety Certification, State Construction and ProjectCommitee Recommended Manufacturer of the Transformationof Urban and Rural Power Grid Construction.
1.what is our payment term ?
Our payment term is usually T/T 30% in advanced, the balance before picking up the goods or L/C at sight.
2.what is the lead time ?
The lead time usually is 10 - 30 working days.
3.what is the package of the cable ?
The package is usually wooden drum or steel wooden drum or coil.also according to customer’s requirment.
4.Could we provide the free sample for customer ?
Sure, we provide the free sample for customer to checking.