Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe
Supply 8 inch jis g3101 ss400 carbon seamless steel pipe

Supply 8 inch jis g3101 ss400 carbon seamless steel pipe

USD $600 - $800 /Ton

Min.Order:1 Ton

Supply Ability:
10000 Ton / Tons per Month
Port:
Qingdao port&Tianjin Port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Thickness:
3, 25
Application:
Structure Pipe
Technique:
Hot Rolled
Alloy Or Not:
Non-alloy
Outer Diameter:
10 - 350 mm

Shandong Hengyuan Metal Material Co., Ltd.

Business Type: Trading Company
Main Products: Steel Bar ,Steel Sheet ,Anchor Pipe ,Sheet Pile Connectors

Product Details

Product Description

1.Technique:Hot rolled 

2. Material: 10#,20#,45#,Q345,A106-B,20Cr,42CrMo,St37,St42,ASTM 4140 etc.

3. Standard: JIS,GB,ASTM,DIN BS


Product Name
 carbon seamless steel pipe
OD
10-350mm/customized design
Wall Thickness
3~25mm/customized design
Length
5.8m~12m/customized design
Surface Treatment 
Black painting, black varnish, transparent oil, epoxy coating, etc.
Packaging
Bundle packing.
Bevelled end or plain end or warnished as per buyer's required.
Marking: as per customer's request
MOQ
1 ton for normal material
Payment Terms
T/T,L/C etc
Testing 
Chemical Component Analysis, Mechanical Properties,
Exterior Size Inspection, hydraulic testing etc.
Application
Low and middle pressure fluid transportation pipeline&Electric industry
Casing Tube& Boiler Pipe&Petroleum and natural gas industry&Chemistry industry
Advantages
 Reasonable price with excellent quality
Abundant stock and prompt delivery
Rich supply and export experience, sincere service


Reliable forwarder, 2-hour away from port.
Products Show
Our Company

Factory

located in Liaocheng Economic and Technological Development Zone, Shandong Province

The hot rolling workshop

 hot rolled seamless steel pipe 2 production lines

The cold rolling workshop 

 cold rolled seamless steel pipe 12 production lines


Team

Our Team

Packing & Delivery

Packing Details  : Packing, Bevelled end or plain end or warnished as per buyer's required.

Delivery Details : Container or bulk carrier Within 7-10 workdays after receiving deposit or L/C


hex bundles with steel strip with two lifting straps


black painting,bevel end and plastic cap


wooden cases
Certifications
FAQ

Q: Are you trading company or manufacturer ?

A: We are a  trading company with our own factory ,manufacture of cold rolled &cold drawn &hot rolled pipes

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:

Contact Us

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~