Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles
Sheet piling corner sections connectors interlocks for steel tubular piles

Sheet piling corner sections connectors interlocks for steel tubular piles

USD $500 - $600 /Ton

Min.Order:10 Tons

Supply Ability:
1000 Ton / Tons per Month
Port:
QINGDAO TIANJIN
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
China
Model Number:
C9
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
ASTM A572

Shandong Hengyuan Metal Material Co., Ltd.

Business Type: Trading Company
Main Products: Steel Bar ,Steel Sheet ,Anchor Pipe ,Sheet Pile Connectors

Product Details

Product Description

Sheet piling corner sections connectors interlocks for steel tubular piles
The AZ, AU, & PU sheet piles have four connectors specifically designed to make your project easier. Each connector has various functions and capabilities. In additon, the connectors can be used with HZM and Pipe-AZ combined wall systems.


C9
The C 9 connector is a corner made to create T sections in sheet pile walls and connect sheet piles to king piles. The C 9 can be attached at almost any angle.


C14
The C 14 corner section is a corner made specifically to turn 90 degree corners.

Products Show
Packing

Packing Details  : Bundles with steel straip or as customers' request

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5~10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 30% by T/T as downpayment, 70% paid by T/T or by irrevocable L/C at sight.
If you have another question, pls feel free to contact us as below:

Contact me

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~