14inch carbon steel pipe Spiral welded pipe
14inch carbon steel pipe Spiral welded pipe
14inch carbon steel pipe Spiral welded pipe
14inch carbon steel pipe Spiral welded pipe
14inch carbon steel pipe Spiral welded pipe
14inch carbon steel pipe Spiral welded pipe

14inch carbon steel pipe Spiral welded pipe

USD $600 - $800 /Ton

Min.Order:3 Tons

Supply Ability:
1000 Ton / Tons per Month
Port:
qingdao and tianjin port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Thickness:
0.8, 6
Application:
Boiler Pipe
Technique:
Cold Rolled
Alloy Or Not:
Non-alloy
Outer Diameter:
10 - 500 mm

Shandong Hengyuan Metal Material Co., Ltd.

Business Type: Trading Company
Main Products: Steel Bar ,Steel Sheet ,Anchor Pipe ,Sheet Pile Connectors

Product Details

Product Description
Product Name
welded spiral steel pipe
Material
Q235A, Q235B, Q345, L245, L290, API5L X42,X52,X60,X70,X80, OCr13,1Cr17,00Cr19Ni11,1Cr18Ni9,0Cr18Ni11Nb,ST37.0,
ST35.8,ST37.2,ST45,ST52,ST52.4,STP G38,STP G42,STPT42,STS49, etc...
Standard
SY/T5037-2000, GB/T9711.1-1997, GB/T9711.2, API-5L, SY/T5040-92, ASTM A53,A106, DIN1626,DIN1629,DIN2448,JIS G3452,JIS G3454,JIS
G3455, JIS G3456,JIS G3457,JIS G3461
Application
Mainly used in water engineering, petroleum and natural gas industry, chemical industry, agricultural irrigation, urban
construction,
Remark
1. Payment terms : T/T ,L/C 2. Terms of trade : FOB ,CFR,CIF ,DDP,EXW
3. Minimum order : 2 tons
4. Delivery time : Within 25 days.
Productivity
5000Tons per month.
Standard
GB/T9711.1 GB/T9711.2 SY/T5037 SY/T5040 API5L
Package
In bundles, Painting, Beveled edges, plastic caps ends, or as buyer's request.
Used
The pipes are widely used in natural gas, offshore oil piling, petroleum, chemical
After sale service
We do what we promised ,We promised what we will do .
The spiral steel pipe is a spiral seam steel pipe with a steel coiled plate as a raw material, which is often extruded and formed by welding with an automatic double-wire submerged arc welding process. The spiral steel pipe feeds the strip steel into the welded pipe unit, and after being rolled by multiple rollers, the strip steel is gradually rolled up to form a round tube blank with an open gap. 3mm, and make the two ends of the welding port flush.
Material Q235A, Q235B, 10 #, 20 #, Q345 (16Mn), L245 (B), L290 (X42), L320 (X46), L360 (X52), L390 (X56), L415 (X60), L450 (X65), L485 (X70), L555 (X80) L290NB / MB (X42N / M), L360NB / MB (X52N / M), L390NB / MB (X56N / M), L415NB / MB (X60N / M), L450MB (X65), L485MB (X70), L555MB (X80) .
Production process
(1) The raw materials are strip coil, welding wire and flux. Before input, it must undergo strict physical and chemical tests. (2) The head and tail of the steel strip are connected by single-wire or double-wire submerged arc welding. After being rolled into steel pipes, automatic submerged arc welding is used for welding. (3) Before forming, the strip steel is leveled, trimmed, planed, surface cleaned and transported, and pre-bent. (4) The electric contact pressure gauge is used to control the pressure of the oil cylinder on both sides of the conveyor to ensure the smooth transportation of the steel strip. (5) Using external control or internal control roll forming. (6) The weld gap control device is used to ensure that the weld gap meets the welding requirements, and the pipe diameter, the amount of misalignment and the weld gap are strictly controlled. (7) Both internal and external welding adopt American Lincoln electric welding machine for single-wire or double-wire submerged arc welding, so as to obtain stable welding quality. (8) All welded seams are inspected by online continuous ultrasonic automatic flaw detector to ensure 100% coverage of non-destructive testing of spiral welds. If there are defects, it will automatically alarm and spray marks, and the production workers will adjust the process parameters at any time according to this, and eliminate the defects in time. (9) Use air plasma cutting machine to cut the steel pipe into single pieces. (10) After cutting into a single steel pipe, each batch of steel pipes must undergo a strict first inspection system to check the mechanical properties, chemical composition, fusion state, surface quality of the steel pipe and non-destructive inspection to ensure the qualification of the pipe making process Only then can it be officially put into production. (11) The parts with continuous sonic flaw detection marks on the welding seam are manually reviewed by ultrasonic and X-ray. If there are defects, after repairing, they will undergo nondestructive inspection again until it is confirmed that the defects have been eliminated. (12) Tubes with butt-welded welds of steel strips and D-joints that intersect spiral welds are all checked by X-ray TV or filming. (13) Each steel tube undergoes a hydrostatic pressure test, and the pressure is radially sealed. The test pressure and time are strictly controlled by the steel pipe hydraulic microcomputer detection device. Test parameters are automatically printed and recorded. (14) Mechanical processing of the pipe end, so that the verticality of the end face, the bevel angle and the blunt edge are accurately controlled

Company Profie
Hui Yuan is a trading company established based on Liaocheng Development Zone Jinyun Steel Pipe Co., Ltd. The factory has more than ten years of professional production experience .Now we have cold rolled seamless steel pipe 12 production lines and hot rolled seamless steel pipe 1 production line,one more hot rolled seamless steel pipe production line is under construction

Our main products are listed as follows: Hot Rolled steel pipe, Precision Cold Rolled steel pipe, Cold Drawn steel pipe, alloy steel pipe, bearing steel pipe, spiral pipe, galvanized pipe,Honed tube,special shape steel pipe.etc.

Our company adheres to the business philosophy of exceeding customer expectations and fulfilling employees' dreams, and keeps making progress to provide customers with reliable products and services.

Our products have been exported to Germany, South Korea, Russia, Malaysia, Pakistan, Thailand, India, Ukraine and other countries and regions. We sincerely welcome friends from all over the world to contact us and establish mutually beneficial business relations.


FAQ
1. Q: Are you a factory or a trading company?
A: We not only have our own factories but also have shares in some other enterprises.
2. Q: Can you provide samples?
A: Yes, if the sample is available in stock.
3. Q: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
4. Q: What is the delivery time?
A: It is based on the order, normally 15 - 20 days after receiving the deposit or L/C at sight.
5. Q: Do you have quality control?
A: Yes, we have gained BV, SGS authentication.
6. Q: What are your payment terms?
A: 100% irrevocable L/C at sight. Or T/T, 30% advance, and balance against the copy of B/L within 3-5 days.
7.Q: What is your MOQ?
A: 10 tons for common size, or mix sizes for a 20 GP container.
Contact Us
Claudia
Phone:+8613863528632
WhatsApp:+8613863528632
skype:Claudia826645
website:https://huiyuansteel.en.china.cn/
company name: shandong huiyuan metal material co.,ltd

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~