prime hot dipped galvanized steel coil China factory
USD $500 - $1,000 /Ton
Min.Order:5 Tons
Shandong Xinhuacai Import and Export Co., Ltd.
ppgi/hdg/gi/secc dx51 zinc coated cold rolled/hot dipped galvanized steel coil/sheet/plate/reels
cold rolled plate sheet zinc plate price galvanized iron coils cold rolled steel coil
steel stripe in roll astm a36 hot rolled steel coils steel plate ss41
price kg structural steelhot rolled steel plate corten steel plate with garde astm a36 a572
Item | Prepainted GI / PPGI / PPGL color coated galvanized steel roof sheet |
Product | Prepainted steel coil |
Grade | SGCC,DX51D,SGCH CGCD1-CGCD3 CGC340-CGC570 |
Standard | GB/T-12754 JIS G 3312 EN 10169 ASTM A755 |
Thickness | 0.17-1.0mm |
Width | 600-1500mm |
Zinc coating | 45-275 G/M2 |
Thickness of top coating | 12-25 microns |
Thickness of back coating | 5-8 microns |
Coil weight | 3-6Tons |
Coil internal diameter | 508mm/610mm |
Surface treatment | Bright and clean,smooth and flat |
Colors | As RAL code |
Lifespan | 10-15 years, very strong corrosion resistance it wouldn't |
Tolerance | Thickness:+/-0.02mm |
Width:+/-2mm | |
Zinc coating:+/-5% | |
Tensile strength | >300mpa |
Yield strength | 370-380mpa |
Steel Grade | Chemical composition % | Mechanic Property | CB of CO Ating | CO Tinge | ||||||
C | Si | Mn | S | P | T.S | Y.S | E.L | |||
x103 | x103 | x102 | x103 | x103 | Mpa | Mpa | % | d=0 180° | G/ M² | |
JIS G3302 SGCC | 12 | 30 | 41 | 31 | 21 | 480 | 300 | 13 | OK | Z60-150 |
JIS G3302 SGCH | 12 | 10 | 21 | 18 | 8 | 680 | 650 | OK | Z60-150 | |
ASTM A653 CSB | 20 | 30 | 60 | 35 | 30 | 386 | 206-380 | 20 | OK | Z80-275 |
DX51D+Z | 29 | 21 | 18 | 1.8 | 11 | 355 | 245 | 38 | OK | Z80-275 |
G550 | 20 | 6 | 73 | 5 | 17 | 715 | 654 | 8 | OK | Z80-275 |
Q1: How can I buy products in my country?
A1: Please send us an inquiry or e-mail, we will reply to you and send you a trade assurance order if you need.
Q2: How long does it take to get the product if I place an order
A2: A: For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
Q3: How to make payment?
A3: First send us an inquiry, and we will reply with our quotation. If our price suits you, we will prepare proforma invoice with our banking detail.
Q4: Can you do customization & reproduction if I provide a photo?
A4: Yes