Tower Crane Hoist Brake Lining Disc For 51.5kw Hoisting Mechanism Spare Parts
USD $20 - $50 /Piece
Min.Order:1 Piece
products description
The brake disc is composed of steel plate, adhesive heat insulation layer and friction block. The steel plate is applied to resist rust. In the painting process, smt-4 furnace temperature tracker is used to detect the temperature distribution in the coating process to guarantee the quality. The heat insulation layer is composed of non-heat transfer materials for the purpose of heat insulation. The friction block is composed of friction materials and adhesives. When braking, it is squeezed on the brake disc or brake drum to generate friction, so as to achieve the purpose of decelerating the brake. As a result of friction, the friction block will be worn gradually, generally speaking, the lower the cost of brake block wear faster.
packing
company information
SYM HOIST & TOWER CRANE EQUIPMENT CO.LTD.located in Shenyang China is one of the biggest supplier and export of tower crane,luffing crane topless crane,passenger hoist along with the spare parts for them.With 21 year’s experience on tower crane rent installation and reconstruction,the company has more than 50 experienced mechanical and electrical engineer responsible for the installation guide,failure diagnosis,maintaince and reconstruction for the tower crane at the construction site.Having a long-time and good cooperative relationship with China’s most famous manufacturer of tower crane and passenger hoist like YONGMAO,SANYO,Sichuan SCM,Zoomlion GJJ,BAODA,etc.The company can offer you the best quality original tower crane and passenger hoist with most competitive price.
our certificate
our service
why choose SYM
FAQ
Q1<>: Are you a trading company or a factory?
A1<>: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2<>: Can you OEM production?
A2<>: Yes, we can customize the production according to the drawings.
Q3<>: How long is your delivery time?
A3<>: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.Always welcome you to visit China for ordering!
Q4<>: Do you test all your goods before delivery?
A4<>: Yes, we have 100% test before delivery.
Q5<>: Is it convenient to see visit your factory ?
A5<>: Yes,we welcome every customer to visit our company.
Q6<>: What is your steel material?
A6<>: Q345B,Q235B