Best Economic Power Station Hydro Power Francis Water Turbine Generator
Best Economic Power Station Hydro Power Francis Water Turbine Generator
Best Economic Power Station Hydro Power Francis Water Turbine Generator

Best Economic Power Station Hydro Power Francis Water Turbine Generator

USD $4000 - $12000 /Set

Min.Order:1 Set

Supply Ability:
20 Set / Sets per Month
Port:
Guangzhou,Shenzhen,Shanghai
Payment Terms:
L/C D/P D/A Credit Card PayPal Other Cash Escrow
Delivery Detail:
60 days

Quick Details View All >

Brand Name:
Forster
Place of Origin:
China
Model Number:
HL190
Type:
Other, Water hydro turbine

Chengdu Forster Technology Co., Ltd.

Business license
Business Type: Manufacturer
Main Products: Hydro turbine generator ,water turbine ,francis turbine ,pelton turbine ,turgo turbine ,kaplan turbine ,pelton generator ,kaplan generator ,francis generator

Product Details

Best Economic Power Station Francis Water Turbine Generator Hydro PowerBest Economic Power Station Hydro Power Francis Water Turbine Generator

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc

Best Economic Power Station Hydro Power Francis Water Turbine Generator

 

Product features : 

1.Francis turbine has the advantages of compact structure, high efficiency and can adapt to a wide range of water head of turbine type. It is one of the widely used ar 20KW mini hydro turbine-generator ound the world;

 

2.When the water flow through the turbine wheel, it enters to radial, axial flow, so it is also called the radial axial flow turbine;

 

3.Francis turbine is also called the Francis turbine. The water flow from the surrounding radial inflow runner, then approximate axial flow runner, runner by the crown, under the ring and the blade;

 

4.It is applicable to the head from a range of 20 meters of up to 700 meters, has the advantages of simple structure, stable operation, and high efficiency, but it is generally used in the head in the range(50 to 400 meters). Single output from tens of KW to several 101000 tile. At present this kind of turbine maximum output has exceeded 700000 kilowatts. A turbine is one of the most extensively used.

 

Product parameters:

HL110-WJ-35 Francis turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed Way
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Vavel controlGuide vane control
Flow rate (m3/s)The output(kw)
HL1 10-WJ-35180.182775220750Direct Connection

200.193279225750


220.23783130750


250.2145886401000


280.2353937451000


30.20.2359970501000


350.25741048601000


400.27901120751000


450.2910811881001000


500.312612531251000


550.3214613141251500


600.3316613721501500


 

Product pictuers:

Best Economic Power Station Hydro Power Francis Water Turbine GeneratorBest Economic Power Station Hydro Power Francis Water Turbine GeneratorBest Economic Power Station Hydro Power Francis Water Turbine Generator

 

Company Information

 

Our Workshop:

Best Economic Power Station Hydro Power Francis Water Turbine Generator 

Advantages:

 Best Economic Power Station Hydro Power Francis Water Turbine Generator

Packaging & Shipping

Best Economic Power Station Hydro Power Francis Water Turbine Generator

 

FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: 

 


Contact Supplier

Ms. Chat Now

You May Like

Recommended Products

View More View Less

Find Similar Products By Category

Electrical Equipment & Supplies > Generators > Alternative Energy Generators
Categories
Hi~