Turbo charger speed Balancing test Machine Full Speed Test for Turbocharger Cartridge Testing
Product Description
1. Appearance:
L×W×H:2.4m×1.2m×1.6m
Weight:200kg
2. Air requirement:
Pressure: 10 bar
Flow rate: >2.0 m3/min( TZQ-8)
>3.0 m3/min( TZQ-16)
Air tank size:>2.0 m3( TZQ-8)
>3.0 m3( TZQ-16)
Connecting pipe is not longer than 5m
Minimum inner diameter 40mm
3. Power
380V 3P 50Hz 2kW
4. Lubricating oil
Volume:30 L
Viscosity:10W/40
Working temperature:35℃
Working pressure:3~6bar
5. Test Range
Rotating speed: 6000~250000 rpm
Vibration:0.1~20 g ( 1 g = 9.8 m/S2 )
Product Show
Contact Information