plastic machine using high pressure VQ series single-stage 20VQ pump
USD $148 - $180 /Piece
Min.Order:1 Piece
Hydradulic Valve Trade Co., Ltd.
3.The side plate is made of dual-metal material,it improved the seizure resistance, and so that the life of pump will be longer.
25VQ | 19 | A | (F) | -1 | A | 30 | R |
Series | Flow code | Port connections | Installation type | Shaft type | Outlet position | Design number | Rotation |
20VQ | 2,3,4,5,6, 7,8,9,10, 11, 12,14 | A-SAE-4 bolt flange | No-marking: Flange Mounting F-Foot: Mountion | -1 Str key -151 Spline | (Viewed from cover end of pump) A-Opposite inlet port B-90°CCW from inlet C-Inline with inlet D-90°CW from inlet | 30 | (Viewed from shaft end of pump) R-right hand for clockwise L-left hand for clockwise |
25VQ | 10,12,14, 15,17,19, 21,25 | -1 Str key -86 HD str key -151 Spline | 20 | ||||
35VQ | 21,25,30, 32,35,38, 45 | ||||||
45VQ | 42,45,50, 57,60,66, 75 |
USgpm Flow(USgpm) at1200r/min and 0.69Mpa
Technical Data
series | Flow code (US gpm) | Geometric displacement mL/r | Max. operating pressure Mpa | Max. speed r/m | Min. speed r/m |
20VQ | 2 | 7(0.43) | 21 | 2700 | 600 |
3 | 10(0.61) | ||||
4 | 13(0.79) | ||||
5 | 16.5(1.01) | ||||
6 | 19(1.16) | ||||
7 | 22(1.40) | ||||
8 | 27(1.67) | ||||
9 | 30(1.85) | ||||
10 | 31.5(1.92) | ||||
11 | 35(2.14) | ||||
12 | 40(2.44) | 16 | |||
14 | 45(2.78) | 14 | |||
25VQ | 10 | 32(1.95) | 21 | 2700 | 600 |
12 | 38(2.32) | ||||
14 | 43.5(2.65) | ||||
15 | 47(2.89) | 2500 | |||
17 | 54(3.30) | ||||
19 | 60(3.66) | ||||
21 | 67(4.13) | ||||
25 | 79.2(4.83) | ||||
35VQ | 21 | 67(4.13) | 21 | 2500 | 600 |
25 | 81(4.94) | ||||
30 | 95(5.80) | ||||
32 | 101(6.16) | ||||
35 | 109(6.65) | 2400 | |||
38 | 119(7.26) | ||||
45 | 143(8.72) | ||||
42 | 134(8.17) | ||||
45 | 143(8.72) | 14 | |||
45VQ | 50 | 159(9.70) | 17.5 | 2400 | 600 |
57 | 181(11.05) | 2200 | |||
60 | 189(11.53) | ||||
66 | 210(12.81) | ||||
75 | 237(14.46) | 14 |
Installation
Shaft type
Packing Details : Styrofoam, carton and wooden case.
Delivery Details : 3-30 days after received 30% payment.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: