Thermal shock Chamber environmental climatic chamber
USD $9,500 - $20,000 /Set
Min.Order:1 Set
Hongjing Test Instrument Co., Ltd.
Hongjin Factory Price Environmental High Low Temperature Thermal Shock Testing Chambers consist of the Test Zone, Heat Storage Zone and Cold Storage Zone. The specimen stay in test zone, hot and cold air will be blew from the storage zones to achieve rapid temperature change for thermal shock.
Product features
1. Faster temperature change rate.
2. Quick temperature recovery, available for faster shock cycle.
3. Cable port available for data acquisition.
4. RS485 communication, Ethernet, available for computer remote control
5. Programmable
Conversion method
The test sample is placed in the test chamber, and the high-pressure cylinder is used to open and close the damper, and the hot and cold air is quickly blown into the test slot according to the action, thereby achieving the purpose of rapid temperature change. Balanced Temperature Control System (TBHC) + Special Design Air Supply Cycle
Material
a) Inner box: SUS304 stainless steel plate.
b) Outer box: Cold-rolled steel plate, pickling phosphating surface, electrostatic spray anti-rust (or stainless steel plate)
c) Basket: SUS316 stainless steel plate.
d) Insulation: double protection of rigid polyurethane foam + aluminum silicate insulation cotton.
e) Damper seal: high and low temperature resistant silicone rubber seals.
Box door
a) Test the door with a single door, open the door and open the front.
b) Two high-low temperature silicone rubber sealing strips and anti-condensation electric heating device for window frame/door frame.
c) With observation window W250xH320mm3 layer vacuum layer, box lamp PL lamp 11W illumination lamp.
Technical Parameters
Test temperature | High temperature impact range: 60 ° C ~ +150 ° C Low temperature impact range: -10 °C ~ -40 °C |
Conversion time | Within 10 seconds |
High temperature slot | RT (normal temperature) ~ +180 °C |
Heating time | About 30 minutes |
Low temperature slot | RT (normal temperature) ~ -65 °C |
Pre-cooling time | About 80 minutes |
Resolution | 0.1 ° C |
Control accuracy | ±0.5°C |
Temperature deviation | ±2.0°C |
Load | No load (if power supply load test is required, power is required) |
Test restrictions | This equipment prohibits the testing and storage of flammable, explosive, corrosive and other items (if the test needs to be explained in advance) |
temperature recovery time | 5 minutes |
temperature exposure time | High temperature zone, 30 minutes each in low temperature zone |
1. Are your company a trading one or a factory?
Factory ,13years focusing on test instruments field,3 years exporting experience.Our factory is in Dongguan, Guangdong, China
2. After an order is placed, when to deliver?
Usually about 15 working days, if we have finished products, we can arrange delivery within 3 working days.
Please note that our production lead time depends on the specific project and the number of projects.
3. What about the warranty with after - sales services?
12 months warranty.
After the warranty, the professional after-sales service team will provide comprehensive technical support to help customers solve problems encountered when using our products, and promptly handle customer problems and complaints.
4. What about the services and product' quality?
Service: ,Design service,Buyer lable service.
Quality: Each instruments must be carried out 100% quality examination and test, the finished products must through a third party calibration institutions before shipping and delivery goods.