Hongjin 50L 80L 100L Desktop Control Temperature Humidity Stability Test Chamber
USD $2,300 - $9,800 /Set
Min.Order:1 Set
Hongjing Test Instrument Co., Ltd.
Air Cooling Temperature Calibration Conditioning Temp Humidity Test Chamber
Hongjin Test and Stability -70 Cycle High Low Temperature Environmental Chamber
Hongjin Alternating Hot and Cold Climate Relative Humidity Calibration Test Chamber
Auto Parts Environmental Performance Temperature Humidity Test Measurement Equipment
Environtment Test Environment Cabinet Dry Cycle Equipment Humidity Stability Testing Chamber
Hongjin Climatic Chamber is used to test the material characteristic for wire type, skin type, plastic, rubber, cloth, Equiped with a special ventilation regulator for maintain the fresh air inside when heating. This testing machine design with sophisticated air-displacement adjustment device and a digital voltage meter, current meter, watt-hours, the timer can be used to measure the air replacement rate. Horizontal circulatory air supply system and both sides of airflow regulator to ensure the internal temperature uniformity and stability.
Characteristics:
1.High and Low temperature chamber test machineUse the high precision microcomputer touch temperature and humidity controller with high stability of platinum resistance to temperature and wind speed in the circulatory system of temperature and humidity test.
2.High and Low temperature chamber test machinecontrol temperature&humidity well-distributed, precisely and steady.
3.High and Low temperature chamber test machine Completely independent system separate for testing in high temperature, low temperature and constant temperature&humidity environment.
Product parameters:
Model | HY-TH-80 | HY-TH-150 | HY-TH-225 | HY-TH-408 | HY-TH-800 | HY-TH-1000 | |
Inner size: W×H×D(mm) | 40*50*40 | 50*60*50 | 60*75*50 | 60*85*80 | 100*100*80 | 100*100*100 | |
External size W×H×D(cm) | 105*165*98 | 105*175*108 | 115*190*108 | 135*200*115 | 155*215*135 | 155*215*155 | |
Temperature range | (low:A:+25℃; B:0℃;C:-20℃; D:-40℃;E:-60℃;F:-70℃) ( high :+100℃/+150℃) | ||||||
Temp analytic accuracy/uniformity | 0.1℃/±2.0℃ | ||||||
Temperature control accuracy | ±0.5℃ | ||||||
Heat; cooling time | Heat up about 4.0°C/min ; Cooling about 1.0°C/min | ||||||
Inner and outer materials | SUS#304 Stainless steel for inner chamber ; Carton Advanced cold plate nano paint for outer | ||||||
heat insulation material | Resistant to high temp ,high density,formate chlorine,ethyl acetum foam insulation materials | ||||||
cooling system | Air cooling/single segment compressor(-40°C) ,air and water double segment compressor (-50°C~-70°C) | ||||||
Protection devices | Fuse switch, compressor overload switch, refrigerant high and low pressure protection switch, super humidity over-temperature protection switch, fuse, failure warning system | ||||||
Parts | Watching window , 50mm testing hole , PL internal bulbs , Wet and dry bulb gauze , partition plate , castorx4,Foot Cupx4 | ||||||
Compressor | Original France"Tecumseh"brand | ||||||
Controller | TEMI South Korea | ||||||
Power | AC220V 50/60Hz & 1,AC380V 50/60Hz 3 | ||||||
weight (kg) | 150 | 220 | 270 | 320 | 450 | 580 |
1. Are your company a trading one or a factory?
Factory ,13years focusing on test instruments field,3 years exporting experience.Our factory is in Dongguan, Guangdong, China
2. After an order is placed, when to deliver?
Usually about 15 working days, if we have finished products, we can arrange delivery within 3 working days.
Please note that our production lead time depends on the specific project and the number of projects.
3. What about the warranty with after - sales services?
12 months warranty.
After the warranty, the professional after-sales service team will provide comprehensive technical support to help customers solve problems encountered when using our products, and promptly handle customer problems and complaints.
4. What about the services and product' quality?
Service: ,Design service,Buyer lable service.
Quality: Each instruments must be carried out 100% quality examination and test, the finished products must through a third party calibration institutions before shipping and delivery goods.