according to IEC61215 standard PV module insulation resistance tester
USD $300 - $700 /Set
Min.Order:1 Set
To understand the compressive power of PV Module panel pressure intensity testing equipment
IEC61730-2:2004 Solar PV Module Bending Test Equipment/Solar PV Module Conduit Bned Test
PV module Salt Mist Aging Testing machine/salt mist aging testing equipment/
-40 Celsius~ 85 Celsius thermal cycle/wet freezing test chamber climate test chamber
HTPV-10
Name:PV Module insulation Resistance tester
Solar panel insulation Resistance testing machine
PV module measurement insulation resistance tester
Standard:according to IEC61215 standard
Purpose:
to determine whether or not the module is sufficiently well-insulated between current-carrying parts and the frame or the outside world
Technical specifications:
Insulation resistance measurement range | 100k-10TΩ(105~1013Ω) |
Insulation resistance base correct level | <1G: 1%,≥1G: 3%,≥10G: 5%,≥1T: 10% |
Output arbitrary negative voltage | 1.0VDC~1000VDC,<100V:voltage step size0.1V,≥100V:voltage step size1V |
the base accurate | 1% |
The maximum charging current | 30mA±5mA |
Auto /manual range | Six range automatic or manual |
Third gear test speed | high speed 55 times/s |
middle speed | 25times /s |
full speed | 3tims/s |
time | 0~999.9s |
Multi-trigger ways | inner trigger, manual trigger , outer trigger and remote trigger |
Feature:
1,High brightness, ultra clear four-color VFD display, multi parameter meanwhile show
2,Full range open circuit and clear zero function
3,Comparator (sorting) function:with 30 groups record , for the waiting object to do GD/NG determine
4,Comparator output:can via select Handler interface, RS232C output sorting result
5,Audible: can set the audible switch
6,Audible and show adjustable, user can according to self requirement set GD/NG audible and adjustable show light
7,With RS232C serial interface
8,Can select Handler interface
9,Compatible SCPI programmable specifications
1.High quality and best after-sell service
2.100% quality inspection before delivery
3.Managment Innovate
4.Strong R & D team
5.Can handle customers's feedback problems and doubt timely
6.Our testing machine have one year Warranty time
contact me