Excavator Main Pump SK220 Hydraulic Pump 2437U402F1
USD $1,500 - $2,500 /Set
Min.Order:1 Set
Jining Haide International Trade Co., Ltd.
Excavator Main Pump SK220 Hydraulic Pump 2437U402F1
Please Attention:
1. Factory direct price
2. Nice quality
3. Free video of examine goods before shipment
4. Small order welcome, Support one peice to delivery
5. Send wrong Goods, refund
Part name | Excavator Main Pump SK220 Hydraulic Pump 2437U402F1 |
Part number | 2437U402F1 |
Application | Excavator SK220, SK250, SK250LC, SK220LC, SK250NLC, SK270LC, MD240C |
Excavator Hydraulic Device 2437U402F1 SK220 Hydraulic Pump Assy Product display:
More products Final Drive, Travel Motor, Travel Gearbox, Hydraulic pump, Swing Motor, Swing Gearbox, Control Valve
SK30SR-3 SK40SR-5 SK45SR-1 SK55UR SK55R-3 SK55-C SK55SR-5 SK55SRX SK60-C SK60-8 SK70SR-2 SK75-8 SK130 SK130-8 SK135SR-2 SK140LC SK140LC-8 SK200-3 SK200-8 SK210LC-8 SK250-8 SK260LC-8 SK270D
We do our best to protect the product from harm in transit.
Ship by sea/by air or by express DHL/UPS/TNT and so on. Choose the most cost-effective mode of transport.
Jining Haide International Trade Co,.Ltd
Our company is located in the famous construction machinery city - Jining, Shandong province, China, and has experience for many years in foreign trade. We are specialized in the export of crawler excavator spare parts, such as Final Drive,Travel Motor, Travel Gearbox, Swing Device, Swing Motor, Swing Gearbox, Hydraulic Pump, Main Control Valve, Excavator cabin, Oil cylinder and so on.
We will supply you all parts with good quality and competitive price.
Welcome all clients contact us and establish mutually beneficial business relationships.
1. We have a complete set of maintenance equipment to provide quality after-sales protection.
2. NO Accumulated Violations
Q: How to guarantee the same?
A: Before sending, We will take pictures and size, Find problems and replace them free of charge.
Q: When to ship?
A: Once getting payment then arrange.
Q: Import customs fee?
A: It depends on import country. We can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about half one month/ one month. It depeds on your address.
Q: Product usage?
A; If any problem about usage, Our engineers will solve at first time.