PC360LC-10 PC360NLC-10 Final Drive 207-27-00480
USD $2,000 - $4,000 /Set
Min.Order:1 Set
Jining Haide International Trade Co., Ltd.
PC360LC-10 PC360NLC-10 Final Drive 207-27-00480
Part name | PC360LC-10 PC360NLC-10 Final Drive 207-27-00480 |
Application | Excavator PC360NLC-10 PC360LC-10 |
PC360NLC-10 PC360LC-10 Final Drive 207-27-00480 Product display:
More products
PC20-3 PC27 PC30 PC35 PC35MR-2 PC40 PC45 PC50 PC60 PC70 PC75 PC75R-2 PC75UU-2 PC78 PC110 PC120 PC128 PC130 PC135 PC150 PC160 PC200 PC200-7 PC210 PC300 PC400 PC450 PC500 PC600 PC750 PC800 PC850
We do our best to protect the product from harm in transit.
Ship by sea/by air or by express DHL/UPS/TNT and so on. Choose the most cost-effective mode of transport.
Jining Haide International Trade Co,.Ltd
Our company is located in the famous construction machinery city - Jining, Shandong province, China, and has experience for many years in foreign trade. We are specialized in the export of crawler excavator spare parts, such as Final Drive,Travel Motor, Travel Gearbox, Swing Device, Swing Motor, Swing Gearbox, Hydraulic Pump, Main Control Valve, Excavator cabin, Oil cylinder and so on.
We will supply you all parts with good quality and competitive price.
Welcome all clients contact us and establish mutually beneficial business relationships.
Production | Brand | Used For |
Final Drive (travel motor, travel gearbox, sprocket)
| All Crawler Excavator:
Cat307 - Cat390 PC20 - PC700 DX27 - DX700 DH27 - DH700 Solar15 - SL520 ZX20 - ZX890 EX20 - EX800 EC13 - EC700 R15 - R805 SK25 - SK495 SH60 - SH800 TB035 - TB290 | |
Hydraulic Pump (Main pump and spare parts) | ||
Swing Device (swing motor, swing reduction gearbox, swing bearing) | ||
Main Control Valve | ||
Cabin | ||
Oil Cylinder(bucket cylinder, arm cylinder, boom cylinder) | ||
Radiator (water radiator, oil cooler) |
Q: How to guarantee the same?
A: Before sending, We will take pictures and size, Find problems and replace them free of charge.
Q: When to ship?
A: Once getting payment then arrange.
Q: Import customs fee?
A: It depends on import country. We can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about half one month/ one month. It depeds on your address.
Q: Product usage?
A; If any problem about usage, Our engineers will solve at first time.