HY Metal Roofing Sheet Double Layer Roll Forming Manufacturing Machine
USD $10000 - $12000 /Set
Min.Order:1 Set
Botou Hangyi roll forming machine CO.,Ltd
HY High speed double layer building used metal roofing roll forming machine
HY Hydraulic aluminum profile double sheets cold forming machine
HY High Speed Roofing Double Layer high speed best quality roll forming machine
HY Full automatic double layer roofing sheet roll forming machine
HY Good quality Corrugated roof tile cold roll forming machine for sale
Working flow:
Decoiler→Feeding material into machine→Forming →Measure length→ Hydraulic cutting→ Finished Products
Parameter
Raw material | |
material | colored steel sheet, galvanized steel sheet, aluminum sheet |
thickness of coil sheet | 0.2-0.8 mm |
material expand width | 1000/1000mm |
Efficiency width | 1200mm |
Machine details | |
roller material | high grade NO. 45 forged steel with 0.05mm hard chrome plating |
shaft material | high grade NO. 45 carbon wrought steel |
cutting blade | Cr12 mould steel with quenched treatment |
diameter of shaft | 70mm or as your requirement |
main frame | 350 H steel |
forming steps | 15/16 stations |
productivity | 25m/min and 5m/min |
hydraulic station power | 3.7 KW |
hydraulic pressure | 10-12MPa |
appearance size | 6500mm*1200mm*1500mm |
hydraulic oil | 40# hydraulic oil |
Electric tension | 380V 50 Hz 3 Phase or as your requirement |
Cut Mode | Hydraulic forming after cutting off |
Electronic control system | PLC, Touch Screen, Encoding counter |
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 20 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 30 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.