Forklift electric dc motors 24v 800w
USD $27 - $35 /Piece
Min.Order:1 Piece
Forklift electric dc motors 24v 800w
Our Jinle hydraulic DC Motors are widely used in forklift lifting, van tail board, wing plate and hydraulic power unit equipment etc. Consists of stator, 100% copper wire armature, commutor and carbon brush etc.
Specifications of Forklift electric dc motors 24v 800w
Model: ZDY211 (permanent magnet DC motor)
Material: 100% copper wire armature
Voltage: 24V
Power: 800W
Speed: 3600rpm
Rotation: CW
O.D: 80mm
Outline Dimension of Forklift electric dc motors 24v 800w
Motor Load Characteristic Curve of Forklift electric dc motors 24v 800w
Parameter of Jinle Forklift electric dc motors 24v 800w
Unload: | ||
Speed(n) | = | 5120rpm |
Current(l) | = | 9.310A |
Max_Torque: | ||
Torque(M) | = | 2.024N.m |
Current(I) | = | 56.230A |
Speed(n) | = | 3242rpm |
Eff | = | 50.78% |
Output Power(P2) | = | 687.10W |
Max_Efficiency: | ||
Eff | = | 55.58% |
Speed(n) | = | 4056rpm |
Torque(M) | = | 0.990N.m |
Current(I) | = | 31.520A |
Output Power(P2) | = | 420.50W |
Max_Pout: | ||
Eff | = | 50.78% |
Speed(n) | = | 3242rpm |
Torque(M) | = | 2.024N.m |
Current(I) | = | 56.230A |
Output Power(P2) | = | 687.10W |
Advantage of Jinle Forklift electric dc motors 24v 800w
1) Low noise, easy brush replacement, 100% copper wire, good quality fresh raw materials
2) Strictly control every production, inspection, packing link
3) Efficient and stable running time,one year warranty
4) OEM and customized service avaliable
5) Advanced automatic and semi-automatic equipments
6) Robust construction for long and reliable service life
7) 12V, 24V, 36V, 48V,60V,72V as per customers' option
8) High class professional R&D team and skilled workers
9) Factory established in 1996 over 20 years' manufacturing experience
10)Highly qualified service, able to solve any problems
1. Business Type
a. We are a factory, located in Wuxi City, Jiangsu Province, near Shanghai and Nanjing
b. Factory cover an area of 6000 square meters
c. Employees: over 80 in office & workshops
2. Certificates
CE, ISO9001:2000 etc.
3. How long could we get the goods?
a. 10-20 days for mass production based on your quantity
b. 5~10 days for Sampe orders
4. Quality Control
We have strict test system in every link of material selection, production and final product, packing according to ISO9001 management.
a. 100% inspection before packing
b. Spot inspection before shipment