Replacement hydraulic oil filter V2.1217-06 fuel hydraulic element ARGO oil filter
USD $15 - $35 /Piece
Min.Order:5 Pieces
Baolilai Daily Chemical Technology Co., Ltd.
10 micron replacement magnetic oil filter 0165R010BN3HC hydraulic filter for power plant
Separator Cartridges for Water Removal from Aviation Fuel Filter SO-424C
Replace TAISEI KOGYO P-GUL-10-40UW hydraulic oil mist filter for CNC machine
Replacement gas turbine generator filter element ARGO V3.0520-06 V3.0723-08 V3.0823-06 V3.1040-03
Replacement ARGO v3.0520-06 Hydraulic lube Oil Filter Element
10um Pleated media liquid fuel filter replace hilco filter cartridge hc645-01-c
ARGO filter has a long service life and can be easily updated and used. In the hydraulic system, it is used to filter out solid particles and colloidal substances in the working medium, and effectively control the pollution degree of the working medium. This series of filter V2.1217-06 is a substitute for the domestically imported filter element, which can replace the ARGO filter V2.1217-06.
Filter material | Glass fiber |
OD | 118mm |
Height | 165mm |
Collapse pressure | 8bar |
Efficency | 99.9% |
Advantage----ARGO filter
1.long lasting
2.Good filtration performance
3.Can be customized according to customer requirements
Application----ARGO filter
1. Filtration of various lubrication equipment.
2, separation and recovery of petrochemical, natural gas in addition to particle filtration.
3. Protection and filtration of air compressor, degreasing and dehydration of compressed gas.
4. Pretreatment filtration of reverse osmosis water and deionized water.
5. Purification of thermal power and nuclear power systems.
6. Dust recovery and filtration of mechanical processing equipment
7. Railway internal combustion engines and generators: filtration of lubricating oil and oil.
1.was established in 2003
2.15 years experience
3.It covers an area of 3000 square meters
4.Professional technical team
Q1 How can we get the quotation of flter cartridges
A: Kindly please let us know the specifications,such as the material,length,micron,adapter,apply in which industry.....
Q2. How about your delivery time?
A: Generally, it will take 25 to 35 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order. and if the item was non standard, we have to consider extra 10-15days for tooling/mould made.
Q3. Can you produce according to the samples or drawings?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q4: How about tooling Charge?
A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.
Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q6: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.